Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
9 Jun 2026, 6:00 pm2d left
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_311350_1
e-NIT No. 12 REW UDHAMPUR of 2026-27 Dated 02-06-2026
Open Tender
Civil Works
90 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹6,000
2 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil | 193 | sqm | 91.7 | ₹17,698.1 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: AKS 80% OR 20% | 26.55 | Cum | 304.8 | ₹8,092.44 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 7 | Cum | 4,826.5 | ₹33,785.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) : 80% C.Concrete 20% boulders | 24 | Cum | 4,774.48 | ₹1,14,587.52 |
| 5 | Providing and laying of dry stone pitching laid horizontal on path including cost of stones | 33.2 | Cum | 1,235.55 | ₹41,020.26 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 156.5 | sqm | 286.35 | ₹44,813.78 |
| 7 | Providing and laying 1:2:4 DPC | 18.58 | Cum | 416.15 | ₹7,732.07 |
| 8 | Carriage of Cement | 6.24 | MT | 147.4 | ₹919.78 |
| 9 | Carriage of Sand | 12.23 | cum | 961.9 | ₹11,764.04 |
| 10 | Carriage of Aggregate | 23.22 | cum | 263.3 | ₹6,113.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1008184.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid