Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹24.8 L
EMD Value
₹49,700
Closing Date
9 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Rs.
OP
11 conditions · 7 needing a document upload
PAN Card copy should be attached.
Goods & Services Tax (GST) registration certificate copy should be attached.
In case of Sole Proprietorship Concern firm has to submitAffidavit certifying the sole Proprietorship of the firm.Thisaffidavit shall be notarized. Or In case of a PartnershipFirm,Firm has to submit (a) Notary certified copy of thePartnershipDeed. (b) A copy of power of Attorney firm has tosubmit (dulyregistered as per prevailing Law) in favour of anindividual totender for the work, sign the agreement etc., andcreate liabilityagainst the Firm. Or In case Tenderer is aCompany registeredunder Companies Act-2013. The tenderershall submit: (a)Thecopies of MOA (Memorandum ofAssociation)/AOA (Articles ofAssociation) of the company.(b) Acopy of Certificate ofIncorporation. (c) A copy of authorization/Power of Attorneyissued by the Company (backed by theresolution of Board ofDirectors) in favour of the individual to signthe tender on behalfof company and create liability against thecompany. Or In caseTenderer is LLP (Limited LiabilityPartnership); If the tender issubmitted on behalf of a LLPregistered under LLP Act-2008, theTenderer shall submit alongwith tender: (a) A copy of LLPAgreement (b) A copy of Certificateof Incorporation (c) A copyof Power of Attorney/Authorizationissued by the LLP in favour ofthe individual to sign the tender onbehalf of the LLP and createliability against the LLP. Or In case ofa tenderer is registeredSociety and Registered trust. Thetenderer shall submit: (a) Acopy of certificate of registration. (b)A copy of Memorandum ofAssociation of Society/Trust Deed (c)Acopy of Power of Attorneyin favour of the individual to sign thetender documents andcreate liability against the society/ Trust.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Format for Certificate to be submitted/uploaded by tenderer Annexure-V ( Click here to download Format)
New annexure for format for certificate ANNEXURE V(A) ( Click here to download Format)
Undertaking Regarding Employment/Partnership of Retired Railway Employees ( Click here to download Format)
Bank Detail/RTGS
Supply, installation and commissioning of 05 Nos. simulator-based RS valve model, for training of Alp's at combined crew lobbies of Raipur Division of S.E.C. Railway: - Total Qty- 05 nos.
RSO-R-RS-Valve-OT-2026-03~SECR
RSO-R-RS-Valve-OT-2026-03
Open
Works - General
6 Months
Raipur, Chhattisgarh
₹0
₹49,700
9 Oct 2026
9 Oct 2026
26 Oct 2026
19 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 24,82,720 | ||
| — | 5.00 | — | — | ||
| Supply, Development and commission of MS based dashboard with industrial finishing compatible for simulator accessories along with Throttle, Horn, power supply and minimum 10 minutes power backup, ventilator system with locking arrangement, a Cab room camera with display and a flasher light unit integrated with RS valve operation(with Buzzer).(Cost Including GST) [Warranty Period: 30 months after the date of completion of work] | — | — | — | 1,74,250 | |
| — | 10.00 | — | — | ||
| Supply, testing and commissioning of composite control processing unit with high resolution graphic accelerator device along with HDMI/D-PORT output with USB ports and its accessories.(Cost Including GST)[Warranty Period: 30 months after the date of completion of work] | — | — | — | 4,86,940 | |
| — | 5.00 | — | — | ||
| Development, testing and commission of composite predefined animated video contains signal pole/indication and rail track for simulating the front view of driver cab. With auto generated signal positioning and value of signals.(Cost Including GST)[Warranty Period: 30 months after the date of completion of work]. | — | — | — | 3,51,245 | |
| — | 5.00 | — | — | ||
| Development, Testing and commission of Locomotive simulation software along with software based dynamic working of panel A, B and C components and capable to store LP/ALP CMS id, Name & crew type, Train Load details, Gradient (Fall/Rise) of the track for generate reports and store movement of crew and also includes: •Trouble shooting- When a fault occurs, proper procedures should be available( e.g. CE ON-OFF, Cooling, pressure issues) •Loco selection- Different type of locomotive such as WAG-9, conventional types affecting EBD. •Tasks- Facility to assign two or three tasks in the same practice session. •Rolling stock - availability of 10 nos. of rolling stocks. •Line selection - Min. three lines to be provided to simulate signal exchange with the adjacent line. •Situation During Night Time or Poor Visibility When a Red Signal is Encountered. •Situation During Foggy Weather. •Situation During Heavy Rain. (Cost Inclusing GST)[Warranty Period: 30 months after the date of completion of work]. | — | — | — | 4,69,245 | |
| — | 5.00 | — | — | ||
| Development, Testing and commission of Administrative & reporting module to manage simulator software & setting with preloaded crew data and necessary reports.(Cost Including GST)[Warranty Period: 30 months after the date of completion of work]. | — | — | — | 2,33,245 | |
| — | 5.00 | — | — | ||
| Supply, Testing and commission of high-definition min 50" diagonal/compatible display device compatible for display high resolution-based graphics animation /video along with HDMI/VGA/USB interface. An additional Desktop computer for admin with admin software installed. (Cost Including GST)[Warranty Period: 30 months after the date of completion of work]. | — | — | — | 2,92,245 | |
| — | 15.00 | — | — | ||
| Supply, Testing and commission of high-definition display interface with touch screen for Panel A, Panel B, Panel C to show the software-based panel accessories.(Cost Including GST) [Warranty Period: 30 months after the date of completion of work]. | — | — | — | 1,68,360 | |
| — | 5.00 | — | — | ||
| Supply of Micro controller-based Master PCB unit with USB serial hardware interface module/cards and required accessories like Throttle, Horn and other fitment accessories with long lever high pressure release Rs valve.(Cost Including GST)[Warranty Period: 30 months after the date of completion of work]. | — | — | — | 1,74,245 | |
| — | 5.00 | — | — | ||
| Complete installation, Fitment and Training along with concern staff training of the RS valve simulator along with Graphical display and application software.(Cost including GST)[Warranty Period: 30 months after the date of completion of work]. | — | — | — | 1,32,945 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SpecialTCRSvalve_2.pdf
ATTACHMENT
GCC-2022_1.pdf
ATTACHMENT
IRGCCWorksACS1-11_1.pdf
ATTACHMENT
scopeofwork.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .