Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | ₹22.9 L | L1 | Accepted-AOC AS PER TENDER COMMITTEE RECOMMENDATION |
| 2 | L2₹23.3 LRejected-Finance | ₹23.3 L | L2 | Rejected-Finance REJECTED ON BEING L2 BIDDER |
| 3 | L3₹24.7 LRejected-Finance ALINAGAR KHOTTADIH BARDDHAMAN BARDDHAMAN 713378 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713378 | ₹24.7 L | L3 | Rejected-Finance REJECTED ON BEING L3 BIDDER |
Tender Value
₹22.9 L
EMD Value
₹28,100
Closing Date
23 Feb 2026, 4:00 pmClosed
Area Engineer (Civil), Kenda Area, ECL
Office of the General Manager Kenda Area, P.O. Haripur, Dist - Burdwan, West Bengal-713378
Construction of 02 nos. transformer shed at quarry 3 of New Kenda OC under Kenda Area
2026_ECL_352769_1
ECL/GM/Knd/AE(C)/ e-tender/25-26/111 dated 09.02.2026
Open Tender
Civil Works - Others
150 days
New Kenda
Please refer Tender documents.
3 documents required · 3 mandatory
₹28,100
9 Mar 2026
12 Feb 2026
24 Feb 2026
12 Feb 2026
23 Feb 2026
13 Feb 2026
12 Feb 2026 - 17 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Single Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50mm (base metal of minimum 0.45mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Colour washing such as green, blue or buff to give an even shade : New work (two or more coats) with a base coat of whiting
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_365566.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid