| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Techno-commercially disqualified |
| 3 | Rejected-Technical IN FRONT OF SBI BANK KHARGONE ROAD SANAWAD DIST KHARGONE SANAWAD KHARGONE WEST NIMAR MADHYA PRADESH 451111 | KHARGONE | MADHYA PRADESH | 451111 | Rejected-Technical Techno-commercially disqualified |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
15 Apr 2020, 3:00 pmClosed
DGM
Admin building, Omkareshwar Power Station, Khandwa
Painting of Stop Log Gantry Crane, Bulk Head Gantry Crane, Draft Tube Gantry Crane, TRCM and Intake Gates other Accessories of Omkareshwar Power Station
2020_NHDC_545515_1
NHDC/3/C/051/NIT-423/20/331 dated 18/02/2020
Open Tender
Civil Works
Works
120 days
Omkareshwar Power Station, NHDC
Please refer Tender documents.
9 documents required · 9 mandatory
₹590
Yes
NHDC Ltd
₹35,000
Yes
19 Jun 2020
18 Feb 2020
20 Apr 2020
18 Feb 2020
15 Apr 2020
18 Feb 2020
18 Feb 2020 - 8 Apr 2020
Amount
Painting of structural components of Hoist including supporting structures and surfaces of hydraulic hoist sun exposed to water as perIS:14177, for which surface preparation by blast cleaning of class 'B', primer coat (two coats)of Zinc phosphate primer to give dry film thickness of 40 ± 5microns per coat and finish coat(one coat) of alkyd based micaceous iron oxide paint give dry film thickness of 65 ± 5 microns followed by two coats of synthetic enamel paint, using airless spray, to give dry film thickness of 25 ± 5 microns per cost, at an interval of 24 hours. Thus total dry film thickness of all the coats, including primer coating, should not be less than175 microns. This will include expenses on mobilisation and demobilisation of equipment’s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debri sand / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete. Upto 1.5 m height
Painting of structural components of Hoist including supporting structures and surfaces of hydraulic hoist sun exposed to water as perIS:14177, for which surface preparation by blast cleaning of class 'B', primer coat (two coats)of Zinc phosphate primer to give dry film thickness of 40 ± 5microns per coat and finish coat(one coat) of alkyd based micaceous iron oxide paint give dry film thickness of 65 ± 5 microns followed by two coats of synthetic enamel paint, using airless spray, to give dry film thickness of 25 ± 5 microns per cost, at an interval of 24 hours. Thus total dry film thickness of all the coats, including primer coating, should not be less than175 microns. This will include expenses on mobilisation and demobilisation of equipment’s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debri sand / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete. Beyond 1.5 m height
Painting of lifting beam/lifting tackles are per IS : 14177, for which surface preparation by blast cleaning, as per class "C" or class "B", primer coat (two coats) of zinc Phosphate primer, to provide dry film thickness of 40 microns per coat and finish coat (two coats) of alkyd based micaceous iron oxide paint, using airless spray, to provide minimum dry film thickness of 65± 5 microns per coat, at an interval of 24 hours. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 200 microns. This will include expenses on mobilisation and demobilisation of equipment’s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete. Upto 1.5 m height
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .