| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹8,381.64 (2.04%)Admitted-Finance | ₹4.2 L+₹8,381.64 (2.04%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 L+₹33,578.77 (8.15%)Admitted-Finance | ₹4.5 L+₹33,578.77 (8.15%) | L3 | Admitted-Finance |
| 4 | L4₹4.5 L+₹34,081.64 (8.28%)Admitted-Finance | ₹4.5 L+₹34,081.64 (8.28%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VETRISELVAN M L4 | M KANAGARAJAN L3 | M ARAVINDH L1 | PRAKASH P L2 |
|---|---|---|---|---|---|---|---|
| 1.00Name Of Work: Construction of RCC Cremation Shed in burial ground at Palayam village in Saptur panchayat | |||||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 9.44 | cum | 263.78 ₹2,490.08 | 263.78 ₹2,490.08 | 249.9 ₹2,359.06 Lowest | 255 ₹2,407.2 |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 3.97 | cum | 5,687.66 ₹22,580.01 | 5,687.66 ₹22,580.01 | 5,066.6 ₹20,114.4 Lowest | 5,170 ₹20,524.9 |
| 4.00 | Refilling the basement with excavated earth other than sand complying the Standard specification | 4.94 | cum | 45.85 ₹226.5 Lowest | 45.85 ₹226.5 Lowest | 1,298.5 ₹6,414.59 | 1,325 ₹6,545.5 |
| 5.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 2.02 | cum | 2,027.41 ₹4,095.37 | 2,027.41 ₹4,095.37 | 1,475.88 ₹2,981.28 Lowest | 1,506 ₹3,042.12 |
| 6.00 | Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete. | 4.1 | cum | 6,224.23 ₹25,519.34 | 6,224.23 ₹25,519.34 | 5,435.08 ₹22,283.83 Lowest | 5,546 ₹22,738.6 |
| 7.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column | 82.53 | cum | 1,095 ₹90,370.35 | 1,095 ₹90,370.35 | 1,008.71 ₹83,248.84 Lowest | 1,029.3 ₹84,948.13 |
| 8.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 750 | cum | 91.96 ₹68,970 Lowest | 91.96 ₹68,970 Lowest | 96.04 ₹72,030 | 98 ₹73,500 |
| 9.00 | R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 8.99 | cum | 9,597.87 ₹86,284.85 | 9,597.87 ₹86,284.85 | 8,382.92 ₹75,362.45 Lowest | 8,554 ₹76,900.46 |
| 10.00 | Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 53.27 | cum | 299 ₹15,927.73 | 291 ₹15,501.57 | 285.18 ₹15,191.54 Lowest | 291 ₹15,501.57 |
Tender Value
₹4.5 L
Closing Date
23 Jan 2026, 3:00 pmClosed
BDO BP
sedapatti
Construction of RCC Cremation Shed in burial ground at Palayam village in Saptur panchayat
2026_RDTN_644821_1
03(04)/MLA/Sedapatti/2025-2026
Open Tender
Civil Works - Others
Works
sedapatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
27 Jan 2026
20 Jan 2026
23 Jan 2026
20 Jan 2026
23 Jan 2026
20 Jan 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Block Development Officer (BP)
Name of Work: Madurai District Construction of RCC Cremation Shed in burial ground at Palayam village in Saptur panchayat
Contract No : BDO (BP) Sedapatti
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE exclusive of GST in figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT TOTAL AMOUNT In Words
1 Name Of Work: Construction of RCC Cremation Shed in burial ground at Palayam village in Saptur panchayat 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_772730.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .