| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹2.2 L+₹5,769 (2.68%)Rejected-AOC | L-2 | Rejected-AOC Being L-2 | |
| 3 | L-3₹2.3 L+₹11,784 (5.48%)Rejected-AOC HIMACHAL PRADESH HP | L-3 | Rejected-AOC Being L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Not uploaded the documents as per NIT |
| Sl No | Description | Qty | Unit | m/sbalagi contector L1 | rohit kumar L3 | RAMA SHANKER L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and laying cement concrete work 1:3:6(1cement :3 Sand :6 graded stone aggregate 20 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth complete in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 27 | Per Cum | 7,800 ₹2,10,600 Lowest | 8,200 ₹2,21,400 | 8,000 ₹2,16,000 |
| 2.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering , strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4meters and removal of the same for in situ- reinforced concrete and works:- | ||||||
| 2.01 | Vertical surfaces such as wall (any thick.) partitions & the like including attached pillasters, buttresses,plinth & string courses & the like (Detail of cost for a parapet wall 15.00 M. Long & 1.00 MTS High) complete in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 12.3 | Per Sqm | 370 ₹4,551 Lowest | 450 ₹5,535 | 400 ₹4,920 |
Tender Value
₹1.5 L
EMD Value
₹3,032
Closing Date
9 Jan 2026, 11:00 amClosed
Executive Engineer
EE JSV Division Barsar
Providing and laying CC work to protect down stream Apron of Dam
2025_HPIPH_124758_1
NIT No 13129-228 dated 30.12.2025
Open Tender
Civil Works
Item Rate
30 days
Sub Division Barsar
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Barsar
₹3,032
7 Mar 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
Providing and laying cement concrete work 1:3:6(1cement :3 Sand :6 graded stone aggregate 20 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth complete in all leads & lifts & to the entire satisfaction of Engineer-in-Charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering , strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4meters and removal of the same for in situ- reinforced concrete and works:-
Vertical surfaces such as wall (any thick.) partitions & the like including attached pillasters, buttresses,plinth & string courses & the like (Detail of cost for a parapet wall 15.00 M. Long & 1.00 MTS High) complete in all leads & lifts & to the entire satisfaction of Engineer-in-Charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
form6.pdf
Tender Documents • 0.44 MB
F8.pdf
Tender Documents • 1.20 MB
BOQ_183436.xls
BOQ • 0.33 MB
termscondition.pdf
Additional Documents • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .