Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹33.8 L
EMD Value
₹3.4 L
Closing Date
26 Oct 2026, 10:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EO SHIVRAJPUR
NP SHIVRAJPUR KANPUR NAGAR
WARD NO-08 NEAR MRF CENTER
2026_DOLBU_1193102_1
241/SBM/2026-27
Open Tender
Civil Works
Percentage
SIVRAJPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
EO
₹3.4 L
6 Oct 2026
6 Oct 2026
26 Oct 2026
6 Oct 2026
26 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbis | 700.07 | Sqm | 13 | ₹9,100.91 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:all kind of soil. | 300.51 | Cum | 102 | ₹30,652.02 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 61.08 | cum. | 155 | ₹9,467.4 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from
natural sources : 8 graded stone aggregate 40 mm nominal
size derived from natural sources) | 40.64 | Cum. | 5,239 | ₹2,12,912.96 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal
size derived from natural sources) | 39.76 | Cum. | 6,801 | ₹2,70,407.76 |
| 7 | Foundations, footings, bases of columns, etc. for mass concrete | 46.4 | Sqm | 310 | ₹14,384 |
| 8 | Lintels, beams, plinth beams, bressumers and cantilevers with water proof ply 12 mm thick | 74.47 | Sqm | 667 | ₹49,671.49 |
| 9 | Columns, Pillars, Piers, Abutments, Posts and Struts | 73.08 | Sqm | 761 | ₹55,613.88 |
| 10 | Suspended floors, roofs, landings, balconies and access platform | 54.51 | sqm | 734 | ₹40,010.34 |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 3,121.48 | kg | 85 | ₹2,65,325.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_2251945.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .