| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.2 Cr+₹1.8 L (1.54%)Rejected-Finance | ₹1.2 Cr+₹1.8 L (1.54%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.2 Cr+₹3.6 L (3.17%)Rejected-Finance GRAM PO NAKHERA DISTRICT MIRZAPUR | ₹1.2 Cr+₹3.6 L (3.17%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.3 Cr+₹14.8 L (13.0%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹1.3 Cr+₹14.8 L (13.0%) | L-4 | Rejected-Finance L-4 |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L4 | M/S RAM KUMAR MAURYA S/O DASHANAND MAURYA L3 | M/S LALMANI MAURYA L2 | M/S RAMPYARE SINGH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling stone work in cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M. with proper completion of work. | 38.4 | M3 | 190 ₹7,296 | 100 ₹3,840 Lowest | 160 ₹6,144 | 150 ₹5,760 |
| 2.00 | Earth work in excavation sand stone, lime stone or Other soft rock by pick axes but not required blasting including all lead & lift with proper completion of work. | 2,897.02 | M3 | 210 ₹6,08,374.2 | 90 ₹2,60,731.8 Lowest | 130 ₹3,76,612.6 | 150 ₹4,34,553 |
| 3.00 | Supplying and filling coarse sand on bed including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 126.2 | M3 | 2,200 ₹2,77,640 | 2,000 ₹2,52,400 Lowest | 2,300 ₹2,90,260 | 2,100 ₹2,65,020 |
| 4.00 | Supplying and laying of 150 micron LDPE film including cost of materials, Labour, all lead & lift,T&P etc. required for proper completion of work. | 840 | M2 | 30 ₹25,200 Lowest | 30 ₹25,200 Lowest | 50 ₹42,000 | 35 ₹29,400 |
| 5.00 | Centering & shuttering for concrete work including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 623.3 | M2 | 190 ₹1,18,427 | 100 ₹62,330 Lowest | 150 ₹93,495 | 180 ₹1,12,194 |
| 6.00 | Laying C.C. 1:2:4 (with 1 cement :2 Coarse sand FM not less than 2.00, 4 stone ballast size 4.75 to 20mm) including cost of all material, labour, all lead & lift. T&P etc. required for proper completion of work. | 201.78 | M3 | 6,100 ₹12,30,858 | 5,800 ₹11,70,324 | 6,000 ₹12,10,680 | 5,700 ₹11,50,146 Lowest |
| 7.00 | Laying C.C. 1:3:6 in foundation (with 1 cement, 3 Coarse sand, 6 stone ballast size 20 to 40mm) including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 269.28 | M3 | 4,200 ₹11,30,976 | 4,000 ₹10,77,120 | 3,400 ₹9,15,552 Lowest | 3,500 ₹9,42,480 |
| 8.00 | Cutting bending, binding and placing reinforcement in position including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 6.95 | MT | 60,000 ₹4,17,000 | 65,000 ₹4,51,750 | 60,000 ₹4,17,000 | 55,000 ₹3,82,250 Lowest |
| 9.00 | R.C.C. work in M-20 (1:1.5:3) with 4.75mm to 20mm size graded hard stone grit and coarse sand including cost of material, labour, T & P etc. required for proper completion of work but excluding cost of reinforcement. | 196.98 | M3 | 6,200 ₹12,21,276 | 6,000 ₹11,81,880 Lowest | 6,500 ₹12,80,370 | 6,700 ₹13,19,766 |
| 10.00 | Providing and laying sealing compound in R.C.C. Pannel construction groove joint in proper position including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 464 | RM | 70 ₹32,480 Lowest | 300 ₹1,39,200 | 170 ₹78,880 | 150 ₹69,600 |
Tender Value
Refer Docs
EMD Value
₹3.0 L
Closing Date
20 Jul 2026, 1:00 pmClosed
S.E. B.S.C.C.C.-1, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Construction of guide wall between K.m. 33.430 to 33.600 and seapage repairing work at K.m. 28.505 of M.J.L.C
2026_UPIDC_1164332_5
02/SE/2026-27
Open Tender
Civil Works
Item Rate
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹3.0 L
20 Sept 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone work in cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M. with proper completion of work. | 38.4 | M3 | - | - |
| 2 | Earth work in excavation sand stone, lime stone or Other soft rock by pick axes but not required blasting including all lead & lift with proper completion of work. | 2,897.02 | M3 | - | - |
| 3 | Supplying and filling coarse sand on bed including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 126.2 | M3 | - | - |
| 4 | Supplying and laying of 150 micron LDPE film including cost of materials, Labour, all lead & lift,T&P etc. required for proper completion of work. | 840 | M2 | - | - |
| 5 | Centering & shuttering for concrete work including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 623.3 | M2 | - | - |
| 6 | Laying C.C. 1:2:4 (with 1 cement :2 Coarse sand FM not less than 2.00, 4 stone ballast size 4.75 to 20mm) including cost of all material, labour, all lead & lift. T&P etc. required for proper completion of work. | 201.78 | M3 | - | - |
| 7 | Laying C.C. 1:3:6 in foundation (with 1 cement, 3 Coarse sand, 6 stone ballast size 20 to 40mm) including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 269.28 | M3 | - | - |
| 8 | Cutting bending, binding and placing reinforcement in position including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 6.95 | MT | - | - |
| 9 | R.C.C. work in M-20 (1:1.5:3) with 4.75mm to 20mm size graded hard stone grit and coarse sand including cost of material, labour, T & P etc. required for proper completion of work but excluding cost of reinforcement. | 196.98 | M3 | - | - |
| 10 | Providing and laying sealing compound in R.C.C. Pannel construction groove joint in proper position including cost of all materials, Labour, all lead & lift, T&P etc. required for proper completion of work. | 464 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tender_Document_Lot_1.pdf
Tender Documents • 2.83 MB
BOQ_2192518.xls
BOQ • 5.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .