| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹2.8 L+₹20,860.66 (8.17%)Rejected-Finance | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | PETCHIAMMAL L1 | MS.P B S CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation For Foundation in all soils and sub-Soils up to 0.30m depth atc complete as per SS20B | 16.5 | Cum | 263 ₹4,339.5 Lowest | 350 ₹5,775 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1.42 | Cum | 5,396 ₹7,662.32 Lowest | 5,450 ₹7,739 |
| 3.00 | RCC 1:1.5:3 mix using 20mm Metal including cost and conveyance of all materials to site and other charges etc complete. | 4.2 | Cum | 9,171 ₹38,518.2 Lowest | 9,250 ₹38,850 |
| 4.00 | Supply and Erection of Centering of Sides and Soffits including all cost and conveyance etc complete. | 21.55 | Sqm | 547 ₹11,787.85 Lowest | 600 ₹12,930 |
| 5.00 | Supply and Fabrication of Steel including all cost and conveyance etc complete. | 337 | Kg | 91.8 ₹30,936.6 Lowest | 100 ₹33,700 |
| 6.00 | Brick work in CM1:5 mix using country bricks including all cost and conveyance etc complete. | 6.96 | Cum | 9,171 ₹63,830.16 Lowest | 9,200 ₹64,032 |
| 7.00 | Plastering in cm1:5 mix using 12mm thick including all cost and conveyance etc complete. | 179.63 | Sqm | 285 ₹51,194.55 Lowest | 330 ₹59,277.9 |
| 8.00 | Painting two coats with ready mixed approved Plastic emulsion of first class quality paint and of approved colour over a priming coat Out side of the Building | 179.63 | Sqm | 262 ₹47,063.06 Lowest | 300 ₹53,889 |
Tender Value
₹3.4 L
EMD Value
₹3,350
Closing Date
15 Sept 2025, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
Compound Wall
2025_RDTN_600860_1
A2 / 5647 / 2023 GF-3
Open Tender
Civil Works - Others
Lump-sum
180 days
Manur
Refer Tender doc
2 documents required · 2 mandatory
₹0
₹3,350
28 Sept 2025
5 Sept 2025
17 Sept 2025
5 Sept 2025
15 Sept 2025
5 Sept 2025
Amount
Earth work excavation For Foundation in all soils and sub-Soils up to 0.30m depth atc complete as per SS20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
RCC 1:1.5:3 mix using 20mm Metal including cost and conveyance of all materials to site and other charges etc complete.
Supply and Erection of Centering of Sides and Soffits including all cost and conveyance etc complete.
Supply and Fabrication of Steel including all cost and conveyance etc complete.
Brick work in CM1:5 mix using country bricks including all cost and conveyance etc complete.
Plastering in cm1:5 mix using 12mm thick including all cost and conveyance etc complete.
Painting two coats with ready mixed approved Plastic emulsion of first class quality paint and of approved colour over a priming coat Out side of the Building
MS.P B S CONSTRUCTION (BID ID -1458920)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .