| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 LAccepted-AOC | ₹38.9 L | L1 | Accepted-AOC Attached |
| 2 | L2₹39.3 LRejected-AOC HAZARIBAGH | JHARKHAND | 825301 | ₹39.3 L | L2 | Rejected-AOC Attached |
Tender Value
₹38.9 L
EMD Value
₹78,000
Closing Date
25 Jul 2026, 5:00 pmClosed
District Engineer, Zila Parishad Hazaribag
Zila Parishad Hazaribag
Construction of Boundary Wall of Govt Primary School Bhagwanpur Village Bhagwanpur Panchayat Rampur Block Chauparan District Hazaribag
2026_ZPHZB_116279_2
19/2026-27
Open Tender
Civil Works
Percentage
Chouparan
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹78,000
18 Aug 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in hard soil (vide classification of soil item - A+B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | - | M3 | 167.33 | - |
| - | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | - | M3 | 55.28 | - |
| - | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 1 | M3 | 589.51 | ₹588.92 |
| - | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | M2 | 356.52 | - |
| - | Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | 1 | M3 | 5,244.08 | ₹5,238.84 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 1 | M3 | 5,218 | ₹5,212.78 |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | - | M3 | 6,082.45 | - |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | M3 | 6,308.87 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 1 | M2 | 194.5 | ₹194.31 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | - | M2 | 465.38 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_157169.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Termscondition.pdf
Tender Documents • 0.36 MB
BOQ_157169.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].