| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC KOLNAIKKANPATTY KOLNAIKKANPATTY PO METTUR TK SALEM DT 636452 | METTUR | SALEM | TAMIL NADU | 636452 | 1 | Accepted-AOC Lowest 1 | |
| 2 | 2₹3.7 L+₹22,046.75 (6.34%)Rejected-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 2 | Rejected-AOC Lowest 2 | |
| 3 | 3₹4.0 L+₹51,579.77 (14.8%)Rejected-AOC | 3 | Rejected-AOC Lowest 3 | |
| 4 | 4₹4.6 L+₹1.2 L (33.2%)Rejected-AOC 28 1 THURAIYUR PUTHUCHINNAKAVUR METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 4 | Rejected-AOC Lowest 4 | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | LENIN ENGINEERING WORKS L2 | SURIYA ENGINEERING CONTRACTORS L3 | SRI SELVALAKSHMI ENTERPRISES L4 | R.S.MEHUL SRI CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00Dismantling the existing RCC column and disposing the debris away from the site as directed by the Engineer including labour charges, lead, lift, transporting and safety appliances etc., complete | |||||||
| 1.01 | Existing damaged RCC column to be dismantled above ground level | 5 | 1 m³ (One Cubic Meter) | 3,925 ₹19,625 Lowest | 4,774.67 ₹23,873.35 | 5,539 ₹27,695 | 3,952.45 ₹19,762.25 |
| 1.02 | Existing damaged RCC column to be dismantled below ground level. | 2 | 1 m³ (One Cubic Meter) | 4,650 ₹9,300 Lowest | 5,728.78 ₹11,457.56 | 6,646 ₹13,292 | 4,742.26 ₹9,484.52 |
| 2.00 | Providing and erecting slurry tight form work / scaffolding using MS steels with required props including cost of all shuttering, scaffolding materials, all lead & lift, fabrication charges and as directed by the Engineer at site. | 17 | 1 m² (One Square Meter) | 1,120 ₹19,040 Lowest | 1,696.37 ₹28,838.29 | 1,968 ₹33,456 | 1,404.25 ₹23,872.25 |
| 3.00 | Providing micro concrete to the columns by using construction chemicals like Rendroc RG or its equivalent mixed with 6mm to 20mm downgraded HBG metal by 30% in volume, after applying bonding agent to the old chipped/cleaned surfac viz nitobond EP or equivalent, Rendroc plug or equivalent chemical for plugging the gaps in shuttering for concreting and as directed by the Engineer incharge including cost of all materials, labour charges, mixing the chemicals using power operated stirrer, vibrating the concrete, curing, all T&P, lead, lift, etc., complete but excluding cost of steel reinforcement. | 5 | 1 m³ (One Cubic Meter) | 42,500 ₹2,12,500 | 44,498 ₹2,22,490 | 51,624 ₹2,58,120 | 39,255.75 ₹1,96,278.75 Lowest |
| 4.00 | Providing steel reinforcement of RTS/MS rods column including cutting, bending, binding, tying and placing in position as directed by the Engineer incharge including cost of steel, binding wire, labour charges, lead, lift, T&P's, etc., complete. | 0.9 | 1 MT (One Metric Tone) | 80,000 ₹72,000 | 76,560 ₹68,904 | 88,819 ₹79,937.1 | 67,525 ₹60,772.5 Lowest |
| 5.00 | Providing plain cement concrete 1:2:4 using 20mm size HBG metal for flooring concrete as directed by the Engineer incharge at site including cost of all materials, labour charges, all leads, lifts, curing etc complete. | 2 | 1 m³ (One Cubic Meter) | 4,900 ₹9,800 Lowest | 5,664 ₹11,328 | 6,571 ₹13,142 | 4,996.85 ₹9,993.7 |
| 6.00 | Plastering in CM 1:3, 20 mm thick mixed with admixtures of super plasticizers to the concrete surfaces of two end columns of Wagon tippler Unit I to IV and as directed by the department Engineer at site including cost of all materials, chipping the old plastered surfaces, applying Nitobond EP to the old surfaces, all labour charges, all lead & lift, safety appliances, scaffolding, curing etc., complete. | 46 | 1 m² (One Square Meter) | 450 ₹20,700 | 516 ₹23,736 | 599 ₹27,554 | 443 ₹20,378 Lowest |
| 7.00 | Painting the plastered surfaces of two end columns of Wagon tippler Unit I to IV with two coats of enamel paint over one coat of primer of approved quality and colour surfaces including cost of all materials, all labour charges, all lead & lift etc., complete. | 46 | 1 m² (One Square Meter) | 148 ₹6,808 Lowest | 188.67 ₹8,678.82 | 218 ₹10,028 | 156.18 ₹7,184.28 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
11 Dec 2025, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I - Civil Circle - Attending rectification works in damaged RCC Column by providing micro concrete in outhaul side in Wagon Tippler of Unit I of MTPS I
2025_EB_629672_1
CE / MTPS-I / SE/ CIVIL / OT.NO.63 / 2025-26
Open Tender
Civil Works
Works
30 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹4,000
Yes
2 Jan 2026
6 Dec 2025
12 Dec 2025
6 Dec 2025
11 Dec 2025
6 Dec 2025
Amount
Dismantling the existing RCC column and disposing the debris away from the site as directed by the Engineer including labour charges, lead, lift, transporting and safety appliances etc., complete
Existing damaged RCC column to be dismantled above ground level
Existing damaged RCC column to be dismantled below ground level.
Providing and erecting slurry tight form work / scaffolding using MS steels with required props including cost of all shuttering, scaffolding materials, all lead & lift, fabrication charges and as directed by the Engineer at site.
Providing micro concrete to the columns by using construction chemicals like Rendroc RG or its equivalent mixed with 6mm to 20mm downgraded HBG metal by 30% in volume, after applying bonding agent to the old chipped/cleaned surfac viz nitobond EP or equivalent, Rendroc plug or equivalent chemical for plugging the gaps in shuttering for concreting and as directed by the Engineer incharge including cost of all materials, labour charges, mixing the chemicals using power operated stirrer, vibrating the concrete, curing, all T&P, lead, lift, etc., complete but excluding cost of steel reinforcement.
Providing steel reinforcement of RTS/MS rods column including cutting, bending, binding, tying and placing in position as directed by the Engineer incharge including cost of steel, binding wire, labour charges, lead, lift, T&P's, etc., complete.
Providing plain cement concrete 1:2:4 using 20mm size HBG metal for flooring concrete as directed by the Engineer incharge at site including cost of all materials, labour charges, all leads, lifts, curing etc complete.
Plastering in CM 1:3, 20 mm thick mixed with admixtures of super plasticizers to the concrete surfaces of two end columns of Wagon tippler Unit I to IV and as directed by the department Engineer at site including cost of all materials, chipping the old plastered surfaces, applying Nitobond EP to the old surfaces, all labour charges, all lead & lift, safety appliances, scaffolding, curing etc., complete.
Painting the plastered surfaces of two end columns of Wagon tippler Unit I to IV with two coats of enamel paint over one coat of primer of approved quality and colour surfaces including cost of all materials, all labour charges, all lead & lift etc., complete.
LENIN ENGINEERING WORKS (BID ID -1531313)
SURIYA ENGINEERING CONTRACTORS (BID ID -1531616)
SRI SELVALAKSHMI ENTERPRISES (BID ID -1531147)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_752952.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .