Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-AOC | L1 | Accepted-AOC L1 IS RATE LOWEST | |
| 2 | L2₹42.5 L+₹22,315.05 (0.53%)Rejected-Finance | L2 | Rejected-Finance L1 RATE IS LOWEST | |
| 3 | L3₹47.2 L+₹4.9 L (11.7%)Rejected-Finance | L3 | Rejected-Finance L1 RATE IS LOWEST | |
| 4 | L4₹47.4 L+₹5.2 L (12.3%)Rejected-Finance A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | L4 | Rejected-Finance L1 RATE IS LOWEST | |
| 5 | L5₹47.9 L+₹5.6 L (13.4%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L5 | Rejected-Finance L1 RATE IS LOWEST |
Tender Value
₹52.1 L
EMD Value
₹1.0 L
Closing Date
29 Apr 2022, 5:00 pmClosed
SUPERINTENDING ENGINEER, MGCCC, BULANDSHAHR
OFFICE OF THE SUPERINTENDING ENGINEER, MGCCC, BULANDSHAHR
Construction of V.R.B. CUM FALL at km 1.860 of UJHARI DY under Madhya Ganga canal project - stage II District Amroha.
2022_UPIDC_691417_1
01/SE/2022-23
Open Tender
Civil Works - Canal
Item Rate
BULANDSHAHR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹1.0 L
2 Jun 2022
22 Apr 2022
30 Apr 2022
22 Apr 2022
29 Apr 2022
22 Apr 2022
Amount
Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge.
Providing & Laying of C.C M-10 (1:3:6) Nominal Mix including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of C.C M-15 (1:2:4) including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of C.C M-20 (1:1:5:3) and coarse including all cost of labour, material,and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of R.C.C M-20 (1:1:5:3) and coarse including all cost of labour, material,and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of C.C M-25 Design mix or (1:1:2) and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Centering & Shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Filling 20 mm thick expansion joint in 1:1 mix with sand with bitumen including cost of all mterial, labour and T&P etc for proper complition of work.as directed by Engineer-in-Charge.
P / Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing pvc pipe 75 mm dia for weep hole and drainage pipe1.00 mtr long above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the length of deck slab in position including cost of all mterial, labour and T&P etc. for proper complition of work. as directed by Engineer-in-Charge
Painting two coats (80/100) of bitumen on top of sleepers after cleaning of surface from dust, rust etc. including cost of all labour and T&P etc. required for proper complition of work.as directed by Engineer-in-Charge
Providing & Laying LDPE film 200 micron including cost of all labour and T&P etc. required for proper complition of work.as directed by Engineer-in-Charge
Providing and laying 100 mm thick Cement Concrete M-15 (1:2:4) lining in canal including cost of all material, labour and T&P etc. complete required for proper complition of work.as directed by Engineer-in-Charge
P / Fixing 20mm expenssion joint with angle iron 75 x 75 x 6 mm on both side and 6 mm thick steal plate over angle iron one side welded contineously including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of coarse sand as filter in and as back filling too including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of 4.20 to 10 mm thick single in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of 10 to 20 mm thick single in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
S / Fixing Marble Name & year plate 450x300x25 mm size. including all cost labour, material and T&P etc for proper completion of work as Directed By Engineer in Charge.
S/ Fixing B.M plate 150x150x25 mm size including all cost labour, material and T&P etc for proper completion of work as Directed By Engineer in Charge.
Supply and fixing wheel guard stone (size 150x150x900) including all cost labour, material and T&P etc for proper completion of work as Directed By Engineer in Charge.
Providing & Fixing of 110 mm G.I Pipe for cables etc. in crash barrier and parapets in position including cost of all mterial, labour and T&P for proper complition of work.as directed by Engineer-in-Charge
E/W in filling embankment making canal section and repairing damaged bank, making approaches and diverson including 1 km lead & lift 1.5 km lift, compaction dressing as requied for proper completion of work including all cost of labour, material and T&P etc. as Directed By Engineer in Charge.
P/L RBM for hard base as trafic should pass comfortable including all cost labour, material and T&P etc for proper completion of work as Directed By Engineer in Charge.
SIDDHI ASSOCIATES
M/S MUBARIK CONTRACTOR
gopi constech pvt. ltd.
ARTIST BRO
RAJENDRA SINGH CONTRACTOR
M/S ARYAN CONSTRUCTION AND SUPPLIERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .