Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical admitted |
| 2 | Accepted-Technical R O TURTUK | Accepted-Technical admitted |
| 3 | Accepted-Technical STAKMO | Accepted-Technical admitted |
| 4 | Accepted-Technical | Accepted-Technical admitted |
| 5 | Accepted-Technical CHUSHUL LADAKH | Accepted-Technical admitted |
Tender Value
₹5.3 L
EMD Value
₹12,620
Closing Date
10 Feb 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of motorable culvert at Norbuling (Opposite Jivetsal Choglamsar)(Under Untied)
2026_PWD_18437_1
100 of I and FC Division Leh 2025-26
Open Tender
Civil Works - Canal
Percentage
30 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹500
Payable To Executive Engineer InFC division Leh
₹12,620
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. a)All kinds of soil:-90%
b)Ordinary rock:-10%
Dry stone pitching (any thickness) including cost of stones.On Horizontal
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form work for : a)Columns, piers, abutments, pillars, posts and struts
b)Suspended floors, roofs, landings, balconies and access platform
c)Edges of slabs and breaks in floors and walls Above 20 cm wide
Carriage of material including loading unloading stacking complete job by mechanical transport a)Sand an avg lead 10Km
b)Stone agg an avg lead 10Km
c)Steel an avg lead 3Km
d)Stone an avg lead 10km
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_44332.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .