Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.0 LAccepted-AOC 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 UDYAM UP 04 0030119 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | ₹12.0 L Quoted ₹12.3 L | 1 | Accepted-AOC due to L-1 bidder |
| 2 | 2₹12.9 LRejected-AOC | ₹12.9 L | 2 | Rejected-AOC due to L-2 bidder |
| 3 | 3₹13.7 LRejected-AOC | ₹13.7 L | 3 | Rejected-AOC due to L-3 bidder |
| Sl No | Description | Qty | Unit | M/S INSTRUMENT CARE GROUP L3 | M/s PRIYA CONSTRUCTION COMPANY L1 | M/S Vikas Electricals L2 |
|---|---|---|---|---|---|---|
| 1.00 | Round the clock Routine & Preventive Maintenance of Complete 0.4 KV LT Switchgear system of main plant & BOP area of Unit No. 5&6 2x250MW PTPP Parichha Jhansi as per scope of work. One Job=01 Month | 6 | Job | 1,10,271 ₹6.6 L | 1,01,373 ₹6.1 L | 1,05,780 ₹6.3 L |
| 2.00 | Routine & Preventive maintenance work of Electrical system of ESP,ASH level indicators,upkeeping of ESP switchgear,ESP Control room & cable gallery etc. Unit No. 5&6 of 2x250MW ,PTPP,Parichha as per csope of work.One Job=01 Month | 6 | Job | 69,735 ₹4.2 L | 61,329 ₹3.7 L | 63,996 ₹3.8 L |
| 3.00 | Breakdown maintenance/Servicing of 0.4 KV LT Air Circuit Breaker of main plant & BOP area of Unit No. 5&6 2x250MW PTPP Parichha Jhansi as per scope of work. | 1 | Each | 9,380 ₹9,380 | 8,503 ₹8,503 | 9,032 ₹9,032 |
| 4.00 | Breakdown maintenance/Servicing of 0.4 KV LT Motor Module above 30 KW as per scope of work. | 1 | Each | 940 ₹940 | 712 ₹712 | 830 ₹830 |
| 5.00 | Dismantling , repairing and Testing of M/s of BHEL make "BAPCON PLUS" Electronic controller as per scope of work | 1 | Each | 58,246 ₹58,246 | 51,745 ₹51,745 | 54,276 ₹54,276 |
| 6.00 | Dismantling ,checking, repairiing/ replacement of defective component assembly and Testing of HVR transformer as per scope of work | 1 | Each | 50,272 ₹50,272 | 46,201 ₹46,201 | 49,276 ₹49,276 |
| 7.00 | Removing and installing the sensing probe from the wall of ASH Hopper as per scope of work. | 1 | JOB | 3,122 ₹3,122 | 2,769 ₹2,769 | 2,988 ₹2,988 |
| 8.00 | Shifting of repaired /damaged/new ESP HVR transformer from place of storage near electrical workshop area to ESP ground floor or viceversa as per scope of work. | 1 | Each | 6,687 ₹6,687 | 5,983 ₹5,983 | 6,488 ₹6,488 |
| 9.00 | Lifting or lowering the HVR Transformer from ground floor to ESP floor and vice-versa as per scope of work. | 1 | Each | 6,549 ₹6,549 | 5,983 ₹5,983 | 6,338 ₹6,338 |
| 10.00 | Cleaning of ESP HVR transformer, Support insulator,Negative bushing and their chamber (01 No HVR transformer have 04 Nos. support Insulator,03 Nos. PIN insulator ,02 Nos. Negative bushing and respetive chamber as per scope of work. | 1 | Each | 4,732 ₹4,732 | 3,918 ₹3,918 | 4,424 ₹4,424 |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
16 Oct 2025, 5:00 pmClosed
SE OMC IV CTPS PARICHHA
SE OMC IV CTPS Parichha
Round the clock Routine, Preventive, Breakdown maintenance of complete LT Switchgear System and Routine, Preventive, Breakdown maintenance work of Electrical system of ESP of Unit No. 5 and 6 ,2x250MW Parichha (Jhansi)
2025_RVUNL_1077359_1
N-PAR/C/OMC4/EMD2/6000009779
Open Tender
Electrical Works
PTPP Parichha
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Dy. Chief Account Officer, CFA and BO, PTPP
₹24,000
23 Dec 2025
25 Sept 2025
17 Oct 2025
25 Sept 2025
16 Oct 2025
26 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid