| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 CrAccepted-AOC | ₹5.5 Cr | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹5.6 Cr+₹10.5 L (1.92%)Rejected-Finance BLDG NO 03 SF 3 SF 4 TECHNO CIDADE CHOGM ROAD ALTO PORVORIM BARDEZ GOA | NORTH GOA | GOA | 403524 | ₹5.6 Cr+₹10.5 L (1.92%) | 2 | Rejected-Finance 2nd lowest |
| Sl No | Description | Qty | Unit | BAGKIYA CONSTRUCTIONS PVT LTD L2 | Kamakshi Infrastructure Construction L1 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 42 | 100 Sq.m | 527.88 ₹22,170.96 | 517.92 ₹21,752.64 Lowest |
| 1.02 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil | 2,135 | Cu.m | 303.16 ₹6,47,246.6 | 297.44 ₹6,35,034.4 Lowest |
| 1.03 | Earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. b) All types of Ordinary rock including all types of laterite rock, blasting prohibited | 988 | Cu.m | 712.32 ₹7,03,772.16 | 698.88 ₹6,90,493.44 Lowest |
| 1.04 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer . | 1,142 | Cu.m | 259.7 ₹2,96,577.4 | 254.8 ₹2,90,981.6 Lowest |
| 1.05 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 1,283 | Cu.m | 2,343.66 ₹30,06,915.78 | 2,299.44 ₹29,50,181.52 Lowest |
| 1.06 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level | 313 | Cu.m | 6,439.5 ₹20,15,563.5 | 6,318 ₹19,77,534 Lowest |
| 1.07 | Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 379 | Cu.m | 7,424.24 ₹28,13,786.96 | 7,284.16 ₹27,60,696.64 Lowest |
| 1.08 | Half brick masonry usign fly ash bricks in cement mortar 1:3 (1 cement : 3 coarse sand ) with bricks of class designation 40 kgs / cm2. Above plinth upto floor V level 200 x 95 x 95 | 30 | Sq.m | 934.92 ₹28,047.6 | 917.28 ₹27,518.4 Lowest |
| 1.09 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All work up to Plinth level | 557 | Cu.m | 7,218.6 ₹40,20,760.2 | 7,082.4 ₹39,44,896.8 Lowest |
Tender Value
₹5.3 Cr
EMD Value
₹10.5 L
Closing Date
20 May 2026, 3:00 pmClosed
Executive Engineer
Paryatan Bhavan pato Panaji Goa
Beautification Illumination Parking and basic amenities for Shree Bhagwati and Sateri Temple Panchwadi Shiroda in Ponda Taluka
2026_GTDCL_29141_1
GTDC/PC/EE(S)/2026-27e-18
Open Tender
Civil Works
Item Rate
Paryatan Bhavan pato Panaji Goa
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹10.5 L
2 Jul 2026
7 May 2026
21 May 2026
7 May 2026
20 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1CIVIL WORKS | ||||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 42 | 100 Sq.m | - | - | 18% |
| 1.02 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil | 2,135 | Cu.m | - | - | 18% |
| 1.03 | Earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. b) All types of Ordinary rock including all types of laterite rock, blasting prohibited | 988 | Cu.m | - | - | 18% |
| 1.04 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer . | 1,142 | Cu.m | - | - | 18% |
| 1.05 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 1,283 | Cu.m | - | - | 18% |
| 1.06 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level | 313 | Cu.m | - | - | 18% |
| 1.07 | Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 379 | Cu.m | - | - | 18% |
| 1.08 | Half brick masonry usign fly ash bricks in cement mortar 1:3 (1 cement : 3 coarse sand ) with bricks of class designation 40 kgs / cm2. Above plinth upto floor V level 200 x 95 x 95 | 30 | Sq.m | - | - | 18% |
| 1.09 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All work up to Plinth level | 557 | Cu.m | - | - | 18% |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.65 MB
Tendernotice_5.pdf
PDF • 1.49 MB
Tendernotice_6.pdf
PDF • 0.90 MB
Tendernotice_7.pdf
PDF • 3.45 MB
BOQ_29574.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .