Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance found responsive |
| 2 | L2₹8.5 LAccepted-Finance | ₹8.5 L | L2 | Accepted-Finance found responsive |
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
18 May 2026, 11:00 amClosed
EE Provl Divn PWD BandR SBS Nagar
EE Provl Divn PWD BandR SBS Nagar
Const of Common Room for Girls in Govt Sen Sec Smart School Sheikhupur Bagh in Distt SBS Nagar
2026_CEPW_167876_1
Tender Notice No 03 Dt 07.05.2026
Open Tender
Civil Works - Buildings
60 days
nawanshahr
Please refer Tender documents.
14 documents required · 14 mandatory
₹5,000
₹18,000
Yes
3 Jun 2026
8 May 2026
18 May 2026
8 May 2026
18 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 20.92 | cum | 191.74 | ₹4,011.49 |
| 2 | Cement concrete 1:4:8 (PCC) | 4.11 | cum | 4,212.95 | ₹17,313.53 |
| 3 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 9.12 | cum | 5,382.33 | ₹49,081.19 |
| 4 | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 20.92 | cum | 66.37 | ₹1,388.59 |
| 5 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 15.82 | sqm | 221.24 | ₹3,500.49 |
| 6 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 1.83 | cum | 5,697.33 | ₹10,437.44 |
| 7 | Centring and shuttering for columns (Square or rectangular or poly gonal in plain) | 25.93 | sqm | 502.52 | ₹13,030.01 |
| 8 | Centring and shuttering for sides and soffits of beam, beams launchings girders bressumers, lintels | 5.16 | Sqm | 400.33 | ₹2,064.9 |
| 9 | Centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 59.54 | Sqm | 560.46 | ₹33,368.58 |
| 10 | Reinforced cement concrete M-20 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 0.28 | cum | 6,217.76 | ₹1,760.91 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 10.38 MB
BOQ_341260.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid