Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.6 L+₹13,745.17 (9.27%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.7 L+₹22,242.18 (15.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.8 L+₹30,089.42 (20.3%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹1.9 L+₹41,735.32 (28.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
17 Aug 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_319718_8
e-NIT 25 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹5,000
Yes
2 Sept 2026
6 Aug 2026
18 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 1.13 | cum | 2,516.85 | ₹2,844.04 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 3.18 | cum | 1,458.45 | ₹4,637.87 |
| 3 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead : Of area of 3 sqm. and below | 2 | each | 110.05 | ₹220.1 |
| 4 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 4.93 | cum | 1,740.45 | ₹8,580.42 |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil :1 meter from
cutting edge | 17.43 | cum | 479.3 | ₹8,354.2 |
| 6 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.75 | cum | 4,826.5 | ₹3,619.88 |
| 7 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulder | 1.72 | cum | 4,774.46 | ₹8,212.07 |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone.Nallah | 4.57 | cum | 2,793.8 | ₹12,767.67 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 1.96 | cum | 7,571.55 | ₹14,840.24 |
| 10 | CAST-IN-SITU
Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.66 | cum | 7,788.4 | ₹5,140.34 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1059998.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .