Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC NO 10 71 VELLALAR STREET PANCHATCHARAM NAGAR CHINNAPANICHERY BHARANIPUTHUR CHENNAI 600 122 | CHENNAI | KANCHIPURAM | TAMIL NADU | 600122 | ₹1.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.8 LRejected-AOC | ₹1.8 L | L2 | Rejected-AOC Not Accepted |
| Sl No | Description | Qty | Unit | SAIBABA ENTERPRISES L1 | V.RADHAKRISHNAN&CO L2 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for Erection of 25MVA, 110/11 KV class PowerTransformer with turrets all HV/LV bushings, cable termination box,cooler bank A frame, fans,Pumps,oil pipelines,Marshalling box,Cooler control cubical,RTCC panel and all accessories which ever is necessary for commissioning of the Transformer. | 1 | unit | 23,500 ₹23,500 Lowest | 38,000 ₹38,000 |
| 2.00 | Labour charges for Earthing of Power Transformer tank , Neutral at 2 points, Marshalling Box, DM box,RTCC Panel etc using 50 x 8 mm MS Flat including cost of supply. (approximately 150KG). | 1 | Unit | 12,000 ₹12,000 | 7,000 ₹7,000 Lowest |
| 3.00 | Labour charges for filling of transformer oil into power transformer through filter machine. | 4,200 | Per | 1.1 ₹4,620 | 0.65 ₹2,730 Lowest |
| 4.00 | Labour charges for transformer oil filtration in main tank and OLTC ( Hot Oil circulation) & filteration upto satisfactory value is achieved. | 17,750 | litr | 2.4 ₹42,600 | 2 ₹35,500 Lowest |
| 5.00 | Labour charges for Gland work of control cables including the cost of glands. 19 mm | 4 | No. | 120 ₹480 Lowest | 125 ₹500 |
| 6.00 | Labour charges for Gland work of control cables including the cost of glands. 15/16 mm | 15 | No. | 110 ₹1,650 Lowest | 135 ₹2,025 |
| 7.00 | Labour charges for Gland work of control cables including the cost of glands. 25mm | 10 | No. | 120 ₹1,200 Lowest | 145 ₹1,450 |
| 8.00 | Labour charges for Gland work of control cables including the cost of glands. 28mm | 10 | No. | 120 ₹1,200 Lowest | 155 ₹1,550 |
| 9.00 | Labour charges for Gland work of control cables including the cost of glands. 32 mm | 12 | No. | 130 ₹1,560 Lowest | 165 ₹1,980 |
| 10.00 | Supply and labour charges for termination of cable core end including the cost of cable socket, lugs, ferruls, strap etc., as per cable schedule in power transformer, Marshalling box, DM box, LV panel, RTCC panel, OLTC and where ever required. | 100 | No. | 24 ₹2,400 Lowest | 25 ₹2,500 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
29 Apr 2025, 2:00 pmClosed
Superintending Engineer/GCC-II/Chennai
Superintending Engineer,GCC II,230 KV CMRL GIS SS,Alandur,chennai-16
As per NIT
2025_EB_548787_1
OT-11/25-26 of SE/GCC-II
Open Tender
Electrical Works
Works
120 days
Pallikaranai, Chennai
Please refer tender document
2 documents required · 2 mandatory
₹0
₹2,000
Yes
8 Jun 2026
21 Apr 2025
30 Apr 2025
21 Apr 2025
29 Apr 2025
21 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].