Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | Admitted-Finance |
| 2 | Admitted-Finance NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | Admitted-Finance |
| 3 | Admitted-Finance D NO 271D3 5 ANDAL NAGAR K R NAGAR NALATINPUTHUR KOVILPATTI TK 628 716 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628716 | Admitted-Finance |
| 4 | Admitted-Finance 52 A CUDDALORE ROAD VRIDDHACHALAM 606 001 CUDDALORE DIST | VRIDDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
8 Jun 2021, 2:00 pmClosed
AEE GL GCC TRY
O/o. SE GCC TRICHY
DCW - Insertion of new tower at Loc.7A and modification of existing tower at Loc.8 for District court campus, Thiruvarur in between the Loc.7,8 of 110 KV SC line from Thiruvarur 110 KV SS to Thiruvarur Railway traction 110 KV SS.
2021_EB_201816_1
GCC 010 GL 007 2021-2022
Open Tender
Civil Works
Works
90 days
Thiruvaur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,500
18 Jun 2021
1 Jun 2021
9 Jun 2021
1 Jun 2021
8 Jun 2021
1 Jun 2021
Amount
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template, labour, fabrication charges etc complete. (Stub and cleat only supplied by department) For KCO Tower
PCC 1:3:6 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift, etc complete.
PCC 1:2:4 using 20mm metal for foundation concrete with formwork including cost of all materials, lead, lift, etc complete.
PCC 1:2:4 using 20mm metal for chimney concrete with form work including cost of all materials, lead, lift, etc complete.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport etc complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Refilling with the excavated earth other than sand including watering consolidation in 150 mm layers and forming platform with excess earth in the leg of the tower etc complete. KCO (wet) Tower
Supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Transport and erection of GI tower angles including cost of materials, T &P, labour, lead, lift etc complete as per approved drawing and specification.
Labour charges for transporting and hoisting of 7 units of 90 KN single suspension Disc insulators with supply and fixing of SS fittings for panther and U bolt including all cost of labour, lead, lift, T & P etc complete. (With out PA rod for panther)
Labour charges for transporting and hoisting of 8 units of 120 KN single Tension Disc insulators with supply and fixing of ST fittings for panther, S.B damper with all allied hardwares including all cost of labour, lead, lift, T & P etc complete.
Labour charges for transport of 2 Nos. of Panther conductor from department store, supply and fixing of panther conductor hardwares (ie.SB damper, D shackle, U bolt, MSJ for panther etc ), paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. (Single span without LC)
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares (ie ST fittings ,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading, lead, lift, cost of T&P, etc complete. (Continuous Span )
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete.
Plastering with CM 1:3, 12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Supply transport, Labour charges for fixing of number plates, danger board, phase plate including all cost of materials, labour, transport, lead, lift, etc complete.
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead, lift etc complete.
Providing temporary guys wherever necessary including excavation, burying out of anchor for stay wire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour, lead, lift etc complete.
Labour charges for removal of Small trees
Labour charges for removal of Large trees
Providing trussels for major and minor road crossing including cost of all materials, labour, lead, lift etc. Complete.
Releasing and lowering of existing 2 Nos. panther conductor and devoluted to store, including all labour, lead, lifts, T&P etc complete.
Releasing and Lowering and restringing of Existing 1 No. 7/3.55 mm GI earthwire including all labour, lead, lifts, T&P, etc complete.
Releasing & Lowering of 8 units of 120 KN tension insulators with fitting and devoluted to store, including cost of all major & minor T & P with all lead, lift etc complete.
Dismantling of existing towers and devoluted to store including sorting out of members, all cost of labour, lead, lift etc complete.
Dismantling the existing tower PCC concrete chimney up 1.50 m below Ground level and the concrete debrish disposed in low lying area with a lead of 1 KM ,cutting the old stub and levelling the ground including cost of all labour, lead, lift, etc complete.
petchimuthu
S CHELLADURAI CONTRACTOR
PERUMAL.S.K
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .