| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | ₹15.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.7 LRejected-AOC | ₹17.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹17.8 LRejected-AOC | ₹17.8 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Subbaiah L2 | K.Arunachalam L3 | Selvam L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of Compound wall and Arch at Keelapavoor Union Office Building Front Side in Kamaraj Nagar Village in Kulasekarapatty Panchayat. | ||||||
| 2.00Compound Wall Abstract | ||||||
| 3.00 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 65.81 | cum | 261 ₹17,176.41 | 265 ₹17,439.65 | 200 ₹13,162 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete | 6.12 | cum | 5,432 ₹33,243.84 | 5,436 ₹33,268.32 | 5,000 ₹30,600 Lowest |
| 5.00 | Centring charges for all concrete works including all cost and conveyance and all labour charges etc complete (Deck Slab Centering) | 145.2 | cum | 1,093 ₹1,58,703.6 | 1,097 ₹1,59,284.4 | 1,000 ₹1,45,200 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 29.79 | cum | 6,141 ₹1,82,940.39 | 6,145 ₹1,83,059.55 | 6,000 ₹1,78,740 Lowest |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 26.01 | cum | 9,045 ₹2,35,260.45 | 9,049 ₹2,35,364.49 | 9,000 ₹2,34,090 Lowest |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site etc., complete | 1.52 | cum | 91,863 ₹1,39,723.62 | 91,867 ₹1,39,729.71 | 91,000 ₹1,38,411 Lowest |
| 9.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 304.57 | cum | 282 ₹85,888.74 | 286 ₹87,107.02 | 200 ₹60,914 Lowest |
| 10.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 236.17 | cum | 260 ₹61,404.2 | 264 ₹62,348.88 | 200 ₹47,234 Lowest |
Tender Value
₹18.6 L
EMD Value
₹18,600
Closing Date
7 Jul 2026, 3:00 pmClosed
BDO (B.PT)
KEELAPAVOOR BDO OFFICE
Construction of Compound wall and Arch at Keelapavoor Union Office Building Front Side in Kamaraj Nagar Village in Kulasekarapatty Panchayat.
2026_RDTN_681547_1
Compound wall and Arch at Keelapavoor Union Office
Open Tender
Civil Works
Works
KEELAPAVOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹18,600
Yes
14 Jul 2026
18 Jun 2026
7 Jul 2026
18 Jun 2026
7 Jul 2026
18 Jun 2026
18 Jun 2026 - 7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Compound wall and Arch at Keelapavoor Union Office Building Front Side in Kamaraj Nagar Village in Kulasekarapatty Panchayat. | - | - | - | - |
| 2 | Compound Wall Abstract | - | - | - | - |
| 3 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 65.81 | cum | 263.78 | ₹17,359.36 |
| 4 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete | 6.12 | cum | 5,434.19 | ₹33,257.24 |
| 5 | Centring charges for all concrete works including all cost and conveyance and all labour charges etc complete (Deck Slab Centering) | 145.2 | cum | 1,095 | ₹1,58,994 |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 29.79 | cum | 6,143.33 | ₹1,83,009.8 |
| 7 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 26.01 | cum | 9,047 | ₹2,35,312.47 |
| 8 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site etc., complete | 1 | cum | 91,865.86 | ₹91,773.99 |
| 9 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 304.57 | cum | 284.27 | ₹86,580.11 |
| 10 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 236.17 | cum | 262.48 | ₹61,989.9 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_819100.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_819100.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].