Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.8 LAdmitted-Finance | -56.00% | ₹15.8 L | L1 | Admitted-Finance |
| 2 | L2₹18.1 LAdmitted-Finance | -49.69% | ₹18.1 L | L2 | Admitted-Finance |
| 3 | L3₹18.5 LAdmitted-Finance | -48.73% | ₹18.5 L | L3 | Admitted-Finance |
| 4 | L4₹18.8 LAdmitted-Finance | -47.79% | ₹18.8 L | L4 | Admitted-Finance |
| 5 | L5₹19.1 LAdmitted-Finance | -46.82% | ₹19.1 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
15 Apr 2026, 4:00 pmClosed
Executive Engineer PMGSY Division Doda
Office of the Executive Engineer PMGSY Division Doda
As per NIT/BOQ
2026_JKRRD_147144_2
E NIT 31 of 2025-26 PMGSY/D/2105-16 Dated 30/03/2026
Open Tender
Civil Works - Roads
45 days
PMGSY Division Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PMGSY Division Doda
₹72,000
8 May 2026
30 Mar 2026
16 Apr 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | |||||
| 2Slip Clearance: | |||||
| 2.1 | In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | - | Cum | 1 | - |
| 2.2 | In soils; mixed with Decomposed Rocks; by blasting or any other means | 1 | Cum | 1 | ₹1 |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 3.1 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 1 | - |
| 3.2 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 3.3 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 4 | Dumping stone including cost of stones. in Horizontal on level. | 1 | Cum | 1 | ₹1 |
| 5FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_228876.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid