Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹2.8 L (2.20%)Admitted-Finance | ₹1.3 Cr+₹2.8 L (2.20%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹14.4 L (11.3%)Admitted-Finance | ₹1.4 Cr+₹14.4 L (11.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹18.1 L (14.3%)Admitted-Finance | ₹1.4 Cr+₹18.1 L (14.3%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹18.8 L (14.8%)Admitted-Finance | ₹1.5 Cr+₹18.8 L (14.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S CHINMAYA RANJAN PARIDA L8 | ORIENTAL INTEGRATED FACILITY MANAGEMENT PVT. LTD. L9 | SINGO ENGINEERING INDIA PRIVATE LIMITED L11 | M/S Kailash Chandra Samal L2 | sandeep builders L4 | Aakar Infra Engineers PVT Ltd L12 | M/s.BASUDEV CONSTRUCTION L7 | SUSANTA KUMAR SWAIN L3 | M/s. P N Construction L5 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L6 | SURYAA CONSTRUCTION L10 | TIWARI CONSTRUCTION CO. L14 | NIRANJAN SAHOO L1 | SUBASH CHANDRA BARIK L15 | MAHIMA ENGINEERING SYSTEMS PRIVATE LIMITED L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Deployment of the following machineries for lifting and shifting purpose as & when required including port entry fees, engagement, running & hire charges of all machineries, operator charges, fuel, lubricants, T&P etc. all complete excluding GST and as per direction of Engineer in charge. NB : No idle hours shall be paid. | ||||||||||||||||||
| 1.01 | Hydra | 16 | Each Hour | 700 ₹11,200 | 1,450 ₹23,200 | 3,000 ₹48,000 | 750 ₹12,000 | 1,500 ₹24,000 | 700 ₹11,200 | 450 ₹7,200 Lowest | 500 ₹8,000 | 700 ₹11,200 | 500 ₹8,000 | 1,200 ₹19,200 | 1,000 ₹16,000 | 900 ₹14,400 | 2,000 ₹32,000 | 2,029 ₹32,464 |
| 1.02 | Tipper | 32 | Each Hour | 700 ₹22,400 | 1,450 ₹46,400 | 2,000 ₹64,000 | 500 ₹16,000 | 1,500 ₹48,000 | 1,500 ₹48,000 | 450 ₹14,400 | 450 ₹14,400 | 900 ₹28,800 | 500 ₹16,000 | 700 ₹22,400 | 1,000 ₹32,000 | 350 ₹11,200 Lowest | 506 ₹16,192 | 2,029 ₹64,928 |
| 1.03 | Excavator - 1 Cum Bucket Capacity. | 32 | Each Hour | 850 ₹27,200 | 1,450 ₹46,400 | 2,000 ₹64,000 | 750 ₹24,000 | 1,500 ₹48,000 | 2,000 ₹64,000 | 1,170 ₹37,440 | 800 ₹25,600 | 650 ₹20,800 | 300 ₹9,600 Lowest | 900 ₹28,800 | 3,000 ₹96,000 | 1,700 ₹54,400 | 730 ₹23,360 | 1,029 ₹32,928 |
| 2.00 | Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing and spreading the excavated material at locations with in 5km lead (avg.) as directed, dewatering etc with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc. all complete excluding GST and as per direction of Engineer in charge. | 7,684 | Each Cum | 60 ₹4,61,040 Lowest | 580.55 ₹44,60,946.2 | 120 ₹9,22,080 | 70 ₹5,37,880 | 100 ₹7,68,400 | 140 ₹10,75,760 | 79 ₹6,07,036 | 90 ₹6,91,560 | 120 ₹9,22,080 | 72 ₹5,53,248 | 110 ₹8,45,240 | 150 ₹11,52,600 | 62 ₹4,76,408 | 203 ₹15,59,852 | 229 ₹17,59,636 |
| 3.00 | Providing cement concrete (1:2:4) (1 cement: 2 sand:4 coarse aggregate) for C.C. work using 12mm & down grade hard black granite (CB) chips of approved quality including mixing, hoisting, laying, consolidating, curing, maintaining, proper level and slope, finished smooth to the exposed surface, providing weep holes with 75mm dia PVC pipes for drainage of water with supply of all labour, material, tollage, taxes, T&P etc. all complete excluding GST and as per direction of Engineer in charge. | 84 | Each Cum | 4,000 ₹3,36,000 | 6,807.35 ₹5,71,817.4 | 6,500 ₹5,46,000 | 3,100 ₹2,60,400 Lowest | 4,000 ₹3,36,000 | 5,000 ₹4,20,000 | 4,050 ₹3,40,200 | 3,900 ₹3,27,600 | 3,500 ₹2,94,000 | 3,800 ₹3,19,200 | 5,500 ₹4,62,000 | 6,000 ₹5,04,000 | 3,800 ₹3,19,200 | 5,457.7 ₹4,58,446.8 | 4,029 ₹3,38,436 |
| 4.00 | Filling with saline sand up to required depth Including collecting, conveying by private trucks / dumpers with all lead and lifts, loading at one end and unloading at other end spreading and laying, watering, compacting by using VRR, dressing, leveling to required height, level and slope etc. with supply of all labour, materials, T&P, taxes, royalties, running & hire charges of VRR, trucks, dumpers, Port entry fees etc. complete excluding GST and as per direction of Engineer in charge.
N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity. | 3,300 | Each Cum | 150 ₹4,95,000 | 219.65 ₹7,24,845 | 219.65 ₹7,24,845 | 140 ₹4,62,000 | 150 ₹4,95,000 | 800 ₹26,40,000 | 180 ₹5,94,000 | 175 ₹5,77,500 | 550 ₹18,15,000 | 200 ₹6,60,000 | 1,200 ₹39,60,000 | 1,500 ₹49,50,000 | 135 ₹4,45,500 Lowest | 332.7 ₹10,97,910 | 329 ₹10,85,700 |
| 5.00 | Collecting and supplying the river sand of good quality with spreading the same over the indentified area to the required level & slope including transporting within a lead of 40 Km. (avg.) by private vehicles with covering at the top to prevent spillage of sand including loading at one end & unloading at other end, spreading in layers, leveling, watering, compacting by smooth wheeled vibratory road roller 8 Ton to 10 Ton capacity with supply of all labour, materials, T&P, all taxes, Port entry fees, engagement hire & running charges of all equipments etc complete excluding GST and as directed by the Engineer in charge.
N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity. | 1,100 | Each Cum | 420 ₹4,62,000 | 1,200 ₹13,20,000 | 1,500 ₹16,50,000 | 400 ₹4,40,000 | 150 ₹1,65,000 Lowest | 1,200 ₹13,20,000 | 450 ₹4,95,000 | 350 ₹3,85,000 | 600 ₹6,60,000 | 330 ₹3,63,000 | 3,000 ₹33,00,000 | 1,200 ₹13,20,000 | 320 ₹3,52,000 | 500 ₹5,50,000 | 529 ₹5,81,900 |
| 6.00 | Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the approved surface in suitable layers, compacting all complete including cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge. | 2,000 | Each Cum | 800 ₹16,00,000 | 548 ₹10,96,000 | 2,000 ₹40,00,000 | 550 ₹11,00,000 | 300 ₹6,00,000 Lowest | 1,600 ₹32,00,000 | 720 ₹14,40,000 | 640 ₹12,80,000 | 600 ₹12,00,000 | 800 ₹16,00,000 | 1,100 ₹22,00,000 | 1,000 ₹20,00,000 | 700 ₹14,00,000 | 1,200 ₹24,00,000 | 979 ₹19,58,000 |
| 7.00 | Providing & laying factory made pre-cast concrete Paver Blocks of M-30 grade of 80mm thick confirming to IS-15658 with consistent and uniform quality, rubber moulded and cured through drying process mechanically vibrated and compacted precast interlocking of approved size, design with providing and laying in position over 50 mm thick average complete coarse sand bed with joints of 3mm thick filled by fine sand including leveling with surface vibrator, temping and sweeping, loading at factory end and unloading at site including transportation, taxes, tollage, Port entry fees etc. complete excluding GST and as per direction of Enginer in charge (excluding 50mm thick sand bed coarse). | 20,000 | Each Sqm | 600 ₹1,20,00,000 | 450 ₹90,00,000 Lowest | 600 ₹1,20,00,000 | 505 ₹1,01,00,000 | 600 ₹1,20,00,000 | 750 ₹1,50,00,000 | 590 ₹1,18,00,000 | 540 ₹1,08,00,000 | 480 ₹96,00,000 | 558 ₹1,11,60,000 | 450 ₹90,00,000 Lowest | 800 ₹1,60,00,000 | 480 ₹96,00,000 | 998 ₹1,99,60,000 | 929 ₹1,85,80,000 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
27 Nov 2020, 5:15 pmClosed
G. D. Sethy ,EE ,HWD-I,PPT
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Trust, Administrative Building, Tele -06722-222020 Mob-9437120010
Development works with Paver Blocks in different locations of Port area.
2020_MoS_595597_1
CE/HWDI/ACCTS-41/19/531
Open Tender
Civil Works
Works
180 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD.
₹3.0 L
Yes
15 Feb 2021
6 Nov 2020
1 Dec 2020
6 Nov 2020
27 Nov 2020
6 Nov 2020
Amount
Deployment of the following machineries for lifting and shifting purpose as & when required including port entry fees, engagement, running & hire charges of all machineries, operator charges, fuel, lubricants, T&P etc. all complete excluding GST and as per direction of Engineer in charge. NB : No idle hours shall be paid.
Hydra
Tipper
Excavator - 1 Cum Bucket Capacity.
Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing and spreading the excavated material at locations with in 5km lead (avg.) as directed, dewatering etc with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc. all complete excluding GST and as per direction of Engineer in charge.
Providing cement concrete (1:2:4) (1 cement: 2 sand:4 coarse aggregate) for C.C. work using 12mm & down grade hard black granite (CB) chips of approved quality including mixing, hoisting, laying, consolidating, curing, maintaining, proper level and slope, finished smooth to the exposed surface, providing weep holes with 75mm dia PVC pipes for drainage of water with supply of all labour, material, tollage, taxes, T&P etc. all complete excluding GST and as per direction of Engineer in charge.
Filling with saline sand up to required depth Including collecting, conveying by private trucks / dumpers with all lead and lifts, loading at one end and unloading at other end spreading and laying, watering, compacting by using VRR, dressing, leveling to required height, level and slope etc. with supply of all labour, materials, T&P, taxes, royalties, running & hire charges of VRR, trucks, dumpers, Port entry fees etc. complete excluding GST and as per direction of Engineer in charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.
Collecting and supplying the river sand of good quality with spreading the same over the indentified area to the required level & slope including transporting within a lead of 40 Km. (avg.) by private vehicles with covering at the top to prevent spillage of sand including loading at one end & unloading at other end, spreading in layers, leveling, watering, compacting by smooth wheeled vibratory road roller 8 Ton to 10 Ton capacity with supply of all labour, materials, T&P, all taxes, Port entry fees, engagement hire & running charges of all equipments etc complete excluding GST and as directed by the Engineer in charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the approved surface in suitable layers, compacting all complete including cost of all materials, labour, T&P, royalties, Taxes, hire & running charges of all equipments, Port entry fees, operator expenses cost of water, fuel, lubricants etc all complete excluding GST and as directed by the Engineer in charge.
Providing & laying factory made pre-cast concrete Paver Blocks of M-30 grade of 80mm thick confirming to IS-15658 with consistent and uniform quality, rubber moulded and cured through drying process mechanically vibrated and compacted precast interlocking of approved size, design with providing and laying in position over 50 mm thick average complete coarse sand bed with joints of 3mm thick filled by fine sand including leveling with surface vibrator, temping and sweeping, loading at factory end and unloading at site including transportation, taxes, tollage, Port entry fees etc. complete excluding GST and as per direction of Enginer in charge (excluding 50mm thick sand bed coarse).
M/S Kailash Chandra Samal
SUSANTA KUMAR SWAIN
sandeep builders
M/s. P N Construction
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
M/s.BASUDEV CONSTRUCTION
M/S CHINMAYA RANJAN PARIDA
ORIENTAL INTEGRATED FACILITY MANAGEMENT PVT. LTD.
SURYAA CONSTRUCTION
SINGO ENGINEERING INDIA PRIVATE LIMITED
Aakar Infra Engineers PVT Ltd
MAHIMA ENGINEERING SYSTEMS PRIVATE LIMITED
TIWARI CONSTRUCTION CO.
SUBASH CHANDRA BARIK
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
PaverBlockTD.pdf
Tender Documents • 1.06 MB
BOQ_625804.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .