Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.2 LAccepted-AOC | L-1 | Accepted-AOC BEING L-1 |
Tender Value
₹19.1 L
EMD Value
₹47,700
Closing Date
19 Oct 2019, 3:00 pmClosed
SE (WORKS)
STPS MPPGCL SARNI
Running Maintenance of Heat Exchanger and Misc. Works of unit 6 to 9 of PH II and III STPS Sarni
2019_MPPGC_26457_1
WT-2740
Open Tender
Miscellaneous Works
Item Rate
365 days
STPS MPPGCL SARNI
AS PER NIT
4 documents required · 4 mandatory
₹1,000
Yes
Payable To
₹47,700
Yes
19 Jun 2020
16 Jul 2019
21 Oct 2019
16 Jul 2019
19 Oct 2019
16 Jul 2019
Servicing of following Auxiliaries
BOILER FEED PUMPS.
CONDENSATE PUMPS.
B.C.W. PUMPS.
DRIP PUMPS.
CLEANING OF FOLLOWING.
BFP SUCTION STRAINERS.
CEP SUCTION STRAINERS.
DETECTION OF LEAKAGE AND PLUGGING OF LEAKY TUBES.
MAIN EJECTOR /GC-1.
GLAND COOLER NO.2 AND LP HEATER 1,2,3,4. WITH REPLACEMENT OF GASKET
GLAND COOLER NO.2 AND LP HEATER 1,2,3,4. WITHOUT REPLACEMENT OF GASKET
INTER & AFTER COOLER OF AIR COMPRESSOR
REPLACEMENT OF GASKET OF VENT CONDENSER
CLEANING OF INSULATION OF VARIOUS HEAT EXCHANGER / PIPE LINES / CROSS OVER PIPES AT TG FLOOR (IN JOB)
COMPLETE OVERHAULING OF FOLOWING AUXILIARIES IN SUPERVISION OF MPPGCL/MANUFACTURERS AUTHORISED REPRESENTATIVE.
BCW PUMP
STATOR WATER PUMPS.
ASSISTANCE IN CLEANING OF FOLLOWING
TUBE CLEANING OF CONDENSOR.IN JOB(1JOB=2CONDENSER
TUBE CLEANING OF MAIN OIL COOLER.
TUBE CLEANING OF BFP WORKING/LUB OIL CLR.
TUBE CLEANING OF SEAL OIL COOLERS.
CONDENSER OF A.C.SYSTEM.
MECH. SEAL WATER COOLER OF BFP
AHU OF AC SYSTEM
DETECTION OF LEAKAGE AND PLUGGING OF LEAKY TUBE
CONDENSOR OF A.C.COMPMPRESSOR.
CHILLER OF A.C.COMPMPRESSOR.
SUCTION FILTERS OF AIR WASHER UNIT (140 FILTERS CLEANING OF A UNIT =1 JOB).
CLEANING AND DETECTION OF TUBE LEAKAGE IN POSTION OF HYDROGEN COOLER
STATOR WATER COOLER
CLEANING AND DOUBLE PAINTING OF FOUNDATION AND OF FOLLOWING AUX.NO(A BFP(2) DRIP PUMP (3) STATOR WATER PUMP(4) AC/DC LUB OIL PUMP(5) AIR COMPR.(06) SOP (07) AC/DC SEAL OIL PUMP (08) JACKING OIL PUMP (09) - CENTRIFUGE (10) HOT WELL MAKE PUMP (11) BABP/TABP/BCW PUMP (12) HP PUMP(13) CEP ( IN SQ.METER.)
MISC WORKS
REPAIR/ REPLACEMENT OF MAIN STEAM/ REHEAT STEAM LINE STUBS.
REPLACEMENT OF BENDS/ JOINT OF 65/100MM NB DRIP LINES/ AIR EVACUTION LINES.
SERVICING OF 250 ATA 100 MM NB STEAM LINE VALVES.
REPAIR OF INSULATION OF VARIOUS T.G. AUXILARYS AT DIFFERENT FLOOR(SQ.MTR.)
REPLACEMENT OF 25 MM NB ROOT/ VENT VALVE REPAIR IN STEAM/ FEED LINES.
REPAIR/REPLACEMENT OF HANGERS IN NON CRITICAL PIPE LINES.
REPLACEMENT OF VALVE OF 100/150 /200NB.
H.P.WELDING ON H.P.HEATER SEAL PLATE JOINT FLASH TANKS ETC. IN RUNNING METER.
SERVICING /OVERHAULING OF FOLLOWING AUX.
BOILER FEED PUMP BEARING CHECKING / REPLACEMNT ALONGWITH ALIGNMENT
BFP MECHANICAL SEAL REPLACEMENT AND DISMENTLING OF BFP UP TO WEARING RING.
SERVICING OF BOOSTER PUMP.
REPLACEMENT OF VALVES OF 200MM/250MMMB
LAYING OF CARBON /ALLOY STEEL PIPE LINE Per Mtr. length including welding
150 mm Nb pipe.
100 mm Nb pipe.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .