Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.0 L
EMD Value
₹9,980
Closing Date
20 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Construction of lane from h/o Abdul Ahad Mir to the h/o Nazir Ahmad Wani at Iqra Mohalla Zewan
2026_HAUDD_330506_6
NOTICE INVITING ETENDER No.47 of 20262027 RRWD SMC DATED 06.11.2026 RRWD
Open Tender
Civil Works
Percentage
60 days
Abdul Ahad Mir to the h/o Nazir Ahmad Wani at Iqra
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹211
FA/CAO AC NO 0216010200000007
₹9,980
6 Nov 2026
6 Nov 2026
23 Nov 2026
9 Nov 2026
20 Nov 2026
9 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 2 | No. | 553 | ₹1,106 |
| - | providing and laying of soling complete job | 2.39 | Cum | 850 | ₹2,031.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 12.48 | Cum | 5,733.6 | ₹71,555.33 |
| - | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade using white cement | 238.19 | Sqm | 1,293.6 | ₹3,08,122.58 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 11.28 | Cum | 6,591.25 | ₹74,349.3 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 60.78 | Sqm | 286.35 | ₹17,404.35 |
| - | Carriage of material by Manual Means H/L: Stone Aggregates/Sand | 33.17 | Cum | 244.36 | ₹8,105.42 |
| - | Carriage of material by mechanical Transport: Stone Aggregates | 21.32 | Cum | 344.49 | ₹7,344.53 |
| - | Carriage of material by mechanical Transport: Sand | 11.85 | Cum | 344.49 | ₹4,082.21 |
| - | Placing and Fixing of Sign Board | 1 | No. | 5,000 | ₹5,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1121328.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .