Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.5 L
Closing Date
19 Apr 2021, 4:00 pmClosed
EXECUTIVE ENGINEER(R-IV)
Room No. 215 2nd Floor SBS Place New Delhi
T/M of SWD System in R-IV Division during 2020-21. Sub Head-Removal of Earth Mixed with Malba of Kushak Nallah from SP Marg to First Lagoon.
2021_NDMC_202736_1
154/EE(R-IV)/2020-21
Open Tender
Civil Works
Works
30 days
NDMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
28 Apr 2021
7 Apr 2021
19 Apr 2021
7 Apr 2021
19 Apr 2021
7 Apr 2021
eTendering System Government of NCT of Delhi Created By: Krishan Mohan Created Date/Time: 28-Apr-2021 07:07 PM Tender Title: Removal of Earth Mixed with Malba of Kushak Nallah from SP Marg to First Lagoon. Tender ID: 2021_NDMC_202736_1
Tender Inviting Authority: EE(R-IV)
Name of work:-T/M of SWD System in R-IV Division during 2020-21. Sub Head:-Removal of Earth Mixed with Malba of Kushak Nallah from SP Marg to First Lagoon.
Contract No:154/EE(R-IV)/2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 HALKE RAM(GSTN-07AIFPR1297RIZE) 445150.00 4.10 463401.00 Four Lakh Sixty Three Thousand Four Hundred and One
2.00 VIAMVI PRIVATE LIMITED(GSTN-07AAGCV0540B1ZU) 445150.00 4.78 466428.00 Four Lakh Sixty Six Thousand Four Hundred and Twenty Eight
3.00 SHIVAJI CONSTRUCTION COMPANY(GSTN-07AIOPP8928L1ZB) 445150.00 7.89 480272.00 Four Lakh Eighty Thousand Two Hundred and Seventy Two
4.00 AARTI CONSTRUCTION(GSTN-NA) 445150.00 4.25 464069.00 Four Lakh Sixty Four Thousand Sixty Nine
5.00 ABS INFRACON(GSTN-NA) 445150.00 -26.99 325004.00 Three Lakh Twenty Five Thousand Four
Lowest Amount Quoted BY: ABS INFRACON(325004.00)
BOQ Summary Details Tender Title: Removal of Earth Mixed with Malba of Kushak Nallah from SP Marg to First Lagoon. Tender ID: 2021_NDMC_202736_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ABS INFRACON 325004.00 L1
2 HALKE RAM 463401.00 L2
3 AARTI CONSTRUCTION 464069.00 L3
4 VIAMVI PRIVATE LIMITED 466428.00 L4
5 SHIVAJI CONSTRUCTION COMPANY 480272.00 L5
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .