Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC WARD NO 20 NEAR BMS OFFICE PARASIA DISTT CHHINDWARA M P PIN 480441 | PARASIA | CHHINDWARA | MADHYA PRADESH | 480441 | L1 | Accepted-AOC Bidder is L1 and has quoted lowest item rates overall | |
| 2 | L2₹5.9 L+₹4.2 L (240.4%)Rejected-Finance URDHAN BASTI PO URDHAN DISTT CHHINDWARA M P PIN NO 480441 | CHHINDWARA | CHHINDWARA | M P | 480441 | L2 | Rejected-Finance Quoted higher rate | |
| 3 | L3₹10.2 L+₹8.5 L (489.4%)Rejected-Finance | L3 | Rejected-Finance Quoted higher rate |
Tender Value
₹7.4 L
EMD Value
₹9,300
Closing Date
6 Jan 2023, 5:00 pmClosed
Staff Officer (Civil), Pench Area
Staff Officer (Civil), AGM Office, Pench Area, P.O. Parasia, Dist. Chhindwara (M.P.) 480441
Toilet Cleaning, Sweeping of Guest House Complex, Dispensary Complex and other Buildings at Bhokai Colony under Nehariya Sub Area.
2022_WCL_265587_1
pe3350-civ-s-e041-2022-23
Open Tender
Civil Works - Others
Item Rate
730 days
Bhokai Colony
As per NIT
3 documents required · 3 mandatory
₹9,300
22 Mar 2023
21 Dec 2022
7 Jan 2023
21 Dec 2022
6 Jan 2023
21 Dec 2022
21 Dec 2022 - 28 Dec 2022
Amount
Cleaning of toilets (WC, Wash Basin, Urinals, Floors etc), Sweeping and moping of floor area including removing nets etc and Brooming of internal roads, pacca floors, Garden, Terrace including Uprooting of jungle vegetation, grass etc all complete as per instruction of E/I. All required mateials for the work i.e. Phenyl, Acid, brooms, clothes etc shall be arranged by contractor. Clearing of Sewer line, chamber, blockage of pipeline and cleaning of Drains inside the premises is also part of scope of work. All work shall be done as per charge instruction / directions and satisfaction of engg in charge. Breakup of Works are as below: 1. Toilet cleaning,floor sweeping, mopping Every day 2. Building premises bromming, jungle cleaning terrace cleaning once in a week. 3. Cleaning of each septic tank Twice in a year 4. Chambers, blockage, Mud-Muck and drain cleaning as and when required as per instructions of Engineer in charge 5. Overhead waer tank cleaning once in a 3 month. (365 Days - 52 Sundays) X 2 Years
Total impact of GST for the purpose of CTC
SILEET ENTERPRISES
PRATIKA CONSTRUCTOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .