| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-AOC | ₹45.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹45.7 L+₹47,041.20 (1.04%)Rejected-Finance | ₹45.7 L+₹47,041.20 (1.04%) | L2 | Rejected-Finance High rate |
| Sl No | Description | Qty | Unit | SENTHILKUMAR CONTRACTOR L2 | BALAJI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Part 1 : Strengthening the road from Ambathurai Main Road to PU Elementary School at Jeevalsaragu Panchayat Estimate Amount : Rs. 13.20 lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete. | 122.22 | sqm | 7 ₹855.54 | 6 ₹733.32 Lowest |
| 3.00 | Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete | 225 | sqm | 24 ₹5,400 | 23 ₹5,175 Lowest |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 84.38 | cum | 2,465 ₹2,07,996.7 | 2,460 ₹2,07,574.8 Lowest |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 675 | cum | 87 ₹58,725 | 86 ₹58,050 Lowest |
| 6.00 | Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.. etc., | 675 | cum | 21 ₹14,175 | 20 ₹13,500 Lowest |
| 7.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 16.88 | cum | 11,366 ₹1,91,858.08 | 11,364 ₹1,91,824.32 Lowest |
| 8.00 | Provision for Km stone, Hm stone,& Guardstone,etc. | 1 | no | 790 ₹790 | 780 ₹780 Lowest |
| 9.00 | Provision for Road Marking | 45 | sqm | 920 ₹41,400 | 890 ₹40,050 Lowest |
| 10.00Construction of Cross Drain at Ch : 0,146m | |||||
Tender Value
₹45.8 L
EMD Value
₹46,000
Closing Date
14 Jan 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER VP ATHOOR
BLOCK DEVELOPMENT OFFICER VP ATHOOR
Strengthening the road at Jeevalsaragu Panchayat 110 IN ATHOOR BLOCK
2026_RDTN_643211_1
TN 05 110 14TH FINANCE COMMISSION 2025-2026 ATHOOR BLOCK
Open Tender
Civil Works - Roads
Item Rate
180 days
BLOCK DEVELOPMENT OFFICER VP ATHOOR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹46,000
Yes
2 Jul 2026
13 Jan 2026
14 Jan 2026
13 Jan 2026
14 Jan 2026
13 Jan 2026
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.. etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Km stone, Hm stone,& Guardstone,etc.
Provision for Road Marking
Construction of Cross Drain at Ch : 0,146m
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum.
Towards the centring charges for sides etc., complete conveyance of all materials & labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
CC 1:3:6 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Construction of Drain
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum.
Towards the centring charges for sides etc., complete conveyance of all materials & labour charges etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost & conveyance of all materials to site and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.. etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Km stone, Hm stone,& Guardstone,etc.
Provision for Road Marking
Provision for sign boards
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 1.42 MB
BOQ_770712.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .