| # | Company | Amount | Rank |
|---|---|---|---|
| 1 | L1₹86.6 L | ₹86.6 L | L1 |
| 2 | L2₹87.8 L+₹1.2 L (1.33%) | ₹87.8 L+₹1.2 L (1.33%) | L2 |
Tender Value
₹96.2 L
EMD Value
₹48,000
Closing Date
11 Aug 2026, 5:30 pmClosed
MS PRIYANKA SHARMA(DFLT)
CHIEF ENGINEER ( TENDER CELL)
NIT 1169 Construction & Maintenance of PMGSY Road Balance work PKG No CG17 254 District-Bijapur
196190
NIT 1169 Construction & Maintenance of PMGSY Road Balance work PKG No CG17 254 District-Bijapur
OPEN TENDER
WORKS
PERCENTAGE
7 days
CHIEF ENGINEER ( TENDER CELL)
Required Past Technical Experience: As per Tender document
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Panchayat and Rural Development (PARD)
WORKS
MS PRIYANKA SHARMA(DFLT)
OPEN TENDER
PERCENTAGE
OPEN TO ALL
CHIEF ENGINEER ( TENDER CELL)
TENDER CELL
CGRRDA RAIPUR
90
7
No
1
196190
11 Aug, 2026 5:30:00 PM IST
14 Aug, 2026 6:05:46 PM IST
27 Jul, 2026 5:30:17 PM IST
NIT 1169 Construction & Maintenance of PMGSY Road Balance work PKG No CG17 254 District-Bijapur
NIT 1169 Construction & Maintenance of PMGSY Road Balance work PKG No CG17 254 District-Bijapur
48000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
9624000.00
2
14 Aug, 2026 5:30:00 PM IST
9624000
AS PER NIT
AS PER NIT
As per Tender document
5000.00 INR
15 documents required · 14 mandatory · 1 optional
₹5,000
₹48,000
11 Aug 2026
27 Jul 2026
14 Aug 2026
27 Jul 2026
14 Aug 2026
BILL OF QUANTITY
Pradhan Mantri Gram Sadak Yojna, Chhattisgarh
Name of District- West Bastar, Bijapur (C.G.) Block: Usoor
Package No. : CG 17 254
Name of Road :- L-040 TO BANJARPARA (Balance work)
Length of Road - 3.50 Km SOR 2018
S.No BOQ Item ID BOQ Description Unit Qauntity Rate Amount 1.00 1.5 3.0 6.0 6.2
1 2.1 Setting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on central line, setting out curves and recording of central line levels and other required levels and distances etc. including setting out of cross-drainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. Km 3.500 20955 73343 Pavement
2 2.2 Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means Sqm 3000.000 1 3000
3 3.2 Compacting Original Ground / Existing Embankment Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. Cum 450.000 29 13050
4 3.8(i) Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with all lift and lead of 50 m as per Technical Specification Clause 307. Earth Work Summary Sheet (C) m 4200.000 88 369600
5 3.3 (I) Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Earth Work Summary Sheet (H) Cum 2118.240 77 163104
6 3.4 (ll) Construction of Embankment with Material Obtained from Pits Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5) Earth Work Summary Sheet (J) Cum 1174.690 246 288974
7 3.12.(b) Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material (Granular material having CBR more than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. Besides G.S.B. Cum 2320.738 280 649807
8 4.1 Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III) Cum 2265.510 910 2061614
9 9.14 (B) Providing and Fixing Informtory and Logo Board of PMGSY Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 Each 1 19249 19249
10 9.15 (A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back Each 1 19621 19621
11 9.8 (I) Kilometre Stones & Boundary Pillar Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 5th Kilometre Stone (precast) Each 0 5180 0
12 9.8 (II) Kilometre Stones & Boundary Pillar Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Ordinary Kilometer Stone (Precast) Each 5 3072 15360
13 9.8 (III) Kilometre Stones & Boundary Pillar Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 200 m stone (precast) Each 14 648 9072
14 7.6 (A) Providing & Laying Cement Concrete Pipe NP3 on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets as per clause 1106 .(A) 600 mm Dia. Rm 110 4099 450890
15 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Cum 44.00 354 15576
0 Tota Q Ammt To Ammt 2 Tota Q To Amm 2 ToQ Amm 0 ToQ Amm 0 ToQ Amm
16 7.1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side . I. Ordinary soil .(i) Upto 3 m depth Cum 257.12 354 91020 CD 29.46 0 10428.84 0 67.02 134.04 47450.16 61.54 123.08 43570.32 143.28 0 0 186.7 0 0
17 7.10 (i) Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (I.) P.C.C grade M 10 Cum 0.00 5107 0 2.67 0 13620.369 0 0 0 0 0 0 0 0 0 0 0 0 0
18 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification Clause 802,803,1202 & 1203 ii P.C.C grade M 15 (i) Nominal mix (1:2.5:5) Cum 229.88 5223 1200663 47.845 0 249894.435 0 50.30 100.6 525433.8 64.64 129.28 675229.44 117.95 0 0 142.39 0 0
19 7.4 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry (B) 1000 mm dia Rm 0.00 6485 0 7.50 0 48637.5 0 0 0 0 0 0 0 0 0 0 0 0 0
20 7.3 (i) Type A (Concrete Cradle) Bedding Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause 1105 (i) Nominal mix (1:2:5:5) Cum 0.00 5093 0 1.066 0 5429.138 0 0 0 0 0 0 0 0 0 0 0 0 0
21 7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 m I P.C.C grade M 15 (Nominal mix (1:2.5:5) Cum 123.94 5387 667665 26.75 53.5 288204.5 35.22 70.44 379460.28 73.66 0 0 108.17 0 0
22 7.23 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8II) Sandy material Cum 0.00 1603 0 0.95 0 1522.85 0 0 0 0 0 0 0 0 0 0 0 0 0
23 7.27 (I) Providing and laying concrete for reinforced cement concrete in superstructure as per drawing and technical specification Clause 800,1205.4 & 1205.5 I. R.C.C grade M 20 (i) For nominal mix 1:2:4 Cum 11.62 6839 79469 2.69 5.38 36793.82 3.12 6.24 42675.36 3.41 0 0 4.85 0 0
24 7.27 (II) Providing and laying concrete for reinforced cement concrete in superstructure as per drawing and technical specification Clause 800,1205.4 & 1205.5 R.C.C. grade M 25 (Design Mix) Cum 28.26 6712 189681 0 0 0 4.72 9.44 63361.28 9.41 18.82 126319.84 25.17 0 0 44.25 0 0
26 7.29 Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MT 2.12 77998 165730 0 0 0 0.3583 0.7166 55893.3668 0.7041 1.4082 109836.7836 3.4122 0 0 5.5719 0 0
27 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 Cum 40.00 335 13400 0 0 0 10 20 6700 10 20 6700 20 0 0 20 0 0
28 7.41 Filler Joint (II) Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications RM 48.00 431 20688 0 0 0 12 24 10344 12 24 10344 12 0 0 18 0 0
29 7.23 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material Cum 171.12 1025.00 175398 0 0 0 39.6 79.2 81180 45.96 91.92 94218 96.71 0 0 113.99 0 0
30 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 Cum 0.00 2115.00 0 0 0 0 0 0 0 0 0 0 2 0 0 4 0 0
Total Cost of Construction work Including GST 7972049.32 #REF!
1 1 Maintenance of Road for First Year Km. 3.50 30000.00 105000.00
2 2 Maintenance of Road for Second Year Km. 3.50 40000.00 140000.00
3 3 Maintenance of Road for Third Year Km. 3.50 70000.00 245000.00 8057833 0.000 11.15 14.88 0.00 0.00
4 4 Maintenance of Road for Fourth Year Km. 3.50 110000.00 385000.00
5 5 Maintenance of Road for Fifth Year Km. 3.50 150000.00 525000.00
Total of Maintenance work 1400000.00 14
Total of Maintenance work Including GST 1652000.00 #REF!
Grand Total 9624049.32 17.64
Say Rs. 96.24 Lakhs
Executive Engineer cum Member Secretay
Project Implementation Unit No. -01
Pradhan Mantri Gram Sadak Yojana Bijapur
District West Bastar, Bijapur
boq_comp_chart.xls
BOQ Comparative Chart • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.12 MB
8400699865870915817_151935_8445462635995327653_80969_Guidelines to Bidders.pdf
NIT • 0.13 MB
6529698083403671823_196190_NIT 1169 Tender Document PMGSY Balance work Bijapur 2018.pdf
NIT • 2.46 MB
3601986738734680429_196190_14 CG17 254 (Balance BOQ).xlsx
BOQ • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .