Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹384.7 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹417.1 Cr+₹32.4 Cr (8.43%)Admitted-Finance 1 7 80 TO 87 MITHONA TOWERS 1 PRENDERGHAST ROAD SECUNDERABAD HYDERABAD TELANGANA 500003 | HYDERABAD | TELANGANA | 500003 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Parnika Commercial And Estates Private Limited L1 | Tata Projects Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Re-development of Safdarjung Railway Station along with construction of Office Building, Signal Building near Motibagh at New Delhi on Engineering Design, Procurement and Construction (EPC) basis including Operation & Maintenance for 1 year during DLP Period together with Associated Development Works by incorporating stipulated specifications, all services (Civil and E&M) adopting conventional concrete construction system using laminated ply form work, as per scope of work, Design Basis Report , Technical Specifications, Drawings etc. complete for redevelopment of Safdarjung Railway Station, New Delhi | 1 | L.S. | - | - |
Tender Value
₹358.2 Cr
EMD Value
₹1.9 Cr
Closing Date
19 Feb 2020, 3:00 pmClosed
General Manager/ Civil
C-4, District Centre, Saket, New Delhi, 110017
Re-development of Safdarjung Railway Station along with Office Building near Moti Bagh at New Delhi on Engineering Design, Procurement and Construction (EPC) basis including Operation and Maintenance for 1 year during DLP Period
2019_IRCON_33667_1
IRCON/1036/SJ-RS/Tender/EPC/08
Open Tender
Civil Works
EPC Contract
730 days
Safdarjung Railway Station
Please Refer Tender Document
10 documents required · 10 mandatory
₹68,600
IRCON International Limited
₹1.9 Cr
IRCON Corporate Office
24 Apr 2020
2 Nov 2019
20 Feb 2020
2 Nov 2019
19 Feb 2020
23 Dec 2019
5 Nov 2019 - 13 Nov 2019
15 Nov 2019
Amount
Re-development of Safdarjung Railway Station along with construction of Office Building, Signal Building near Motibagh at New Delhi on Engineering Design, Procurement and Construction (EPC) basis including Operation & Maintenance for 1 year during DLP Period together with Associated Development Works by incorporating stipulated specifications, all services (Civil and E&M) adopting conventional concrete construction system using laminated ply form work, as per scope of work, Design Basis Report , Technical Specifications, Drawings etc. complete for redevelopment of Safdarjung Railway Station, New Delhi
Tata Projects Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .