Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | ₹7.8 L | L1 | Accepted-AOC Accepted since L1 |
| 2 | L2₹8.3 L+₹43,500 (5.54%)Rejected-Finance 2 700 PRAKASH NAGAR PRODDATUR KADAPA 516360 ANDHRA PRADESH INDIA | PRODDATUR | KADAPA | ANDHRA PRADESH | 516360 | ₹8.3 L+₹43,500 (5.54%) | L2 | Rejected-Finance Not L1. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT conditions |
Tender Value
₹7.6 L
EMD Value
₹15,230
Closing Date
22 Mar 2022, 5:30 pmClosed
Officer-in-Charge
ACS,AAI, Shanti Nagar, Kolagal Road,Bellary,Karnataka-583104
Provide Support Services for New DVOR Installation at ACS,AAI,Bellary
2022_AAI_107801_1
AAI/BI/CNS/DVOR/SERVICES/2022
Open Tender
Miscellaneous Works
Works
45 days
ACS, AAI, Shanti nagar, Kolagal Road, Bellary
Please refer Tender Document
17 documents required · 17 mandatory
₹590
Yes
₹15,230
Yes
27 May 2022
28 Feb 2022
28 Mar 2022
1 Mar 2022
22 Mar 2022
1 Mar 2022
1 Mar 2022 - 18 Mar 2022
Amount
To provide supporting manpower(semi-skilled) for installation works : 10 persons for 40 days(in 2 phases), 8 Hrs per day Details of work: Unpacking of crates, shifting of equipment racks,antenna, loading and unloading of items, assistance for structural works and cabling works at the installation site.
To provide crane services: Crane - Hydra type with boom lenth not less than than 50 ft, 15 to 17 Ton capacity for structural installation works for 10 days 8 Hrs per day with crane operator.
To Provide Gas welder and Arc welder with required machinery and materials:
Gas welder to weld Earthing strips – joints on copper earth strip for 10 days (8hours per day) with required machinery and materials
Arc welder to weld structural Joints for 10 days (8 hours per day) with required machinery and materials
To provide Total Station Survey: To survey North marking and Antenna positions at DVOR site for 5 days.
To Provide Dedicated SUV type Vehicle: Dedicated 7-Seater Toyota Innova type Vehicle for pick up and dropping of Installation Team from Hotel to AAI Site with Driver and along with Oil Charges for approximately 50 Kms per Day. 40 Days – 9 hrs. per day in two phases
SIVA SAI CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .