Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance 32A MAHATMA GANDHI ROAD KOLKATA 700041 | KOLKATA | KOLKATA | WEST BENGAL | 700041 | -19.50% | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 L+₹15,979.87 (4.36%)Admitted-Finance 215 RAIPUR ROAD KOLKATA 700047 | KOLKATA | KOLKATA | WEST BENGAL | 700047 | -15.99% | ₹3.8 L+₹15,979.87 (4.36%) | L2 | Admitted-Finance |
| 3 | L3₹4.4 L+₹74,663.78 (20.4%)Admitted-Finance TAMLUK AL DIVISION TAMLUK PURBA MEDINIPUR | MEDINIPUR WEST | WEST BENGAL | 721130 | -3.10% | ₹4.4 L+₹74,663.78 (20.4%) | L3 | Admitted-Finance |
| 4 | L4₹4.6 L+₹93,329.73 (25.5%)Admitted-Finance KALIKA DAS NATUN BAZAR COOCH BEHAR 736101 W B | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | +1.00% | ₹4.6 L+₹93,329.73 (25.5%) | L4 | Admitted-Finance |
| 5 | L5₹4.6 L+₹97,882.40 (26.7%)Admitted-Finance | +2.00% | ₹4.6 L+₹97,882.40 (26.7%) | L5 | Admitted-Finance |
Tender Value
₹4.6 L
EMD Value
₹9,105
Closing Date
18 Jul 2026, 2:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER, PLANNING DIVIS
OFFICE OF THE EXECUTIVE ENGINEER, PLANNING DIVIS
De-Siltation of Khal from Surya Nagar Culvert Road side Drain to Pinjrapole Tower under Bally Municipal area.
2026_KMDA_1031335_1
04/KMDA/SD/EE (Plng Divn.) of 2026-27, Dt - 03.07.2026 (2nd Call)
Open Tender
CIVIL WORKS
Percentage
15 days
Bally Municipal Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,105
Yes
14 Aug 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds,bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | - | Sqm | 5 | - |
| 2 | Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes,carcasses, municipal garbage sludge,polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete. | - | Sqm | 30 | - |
| 3 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.)
(a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M | - | Cum | 146 | - |
| 4 | Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete. Measurement : By stacks at loading point after deducting voids as perrule. (This item can only be used after obtaining permission from theconcerned Superintending Engineer). ( Consider 75%) | - | Cum | 117 | - |
| 5 | Goods and Services Tax (GST) @ 0 % on Sl No. - 01 to 4 | 1 | Total | - | - |
| 6 | Cess @ 1 % on Sl No. - 01 to 5 | 1 | Total | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 1.19 MB
Tendernotice_3.pdf
PDF • 1.54 MB
BOQ_2532433.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .