Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.0 CrAccepted-AOC AURANGABAD | MAHARASHTRA | 423701 | ₹53.0 Cr | L1 | Accepted-AOC work order issued |
| Sl No | Description | Qty | Unit | Vishal Construction L1 |
|---|---|---|---|---|
| 1.00A)NH 66 To Palchil To Khadkwane To Goldara To MDR 99 Road (MRL-12, VR-63) Tal-Poladpur | ||||
| 1.01 | Clearing and Grubbing Road Land-By mechenical means-In area of non-thorny jungle- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including all lifts, leads and including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201, As per directed by Engineer Incharge. | 1.05 | Hectar | 30,132 ₹31,638.6 Lowest |
| 1.02 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. Girth Above 300 mm to 600 mm | 4 | Each | 840.96 ₹3,363.84 Lowest |
| 1.03 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means- Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4, As per directed by Engineer Incharge. | 7,890 | One Square Meter | 22.5 ₹1,77,525 Lowest |
| 1.04 | Construction of Subgrade and Earthen Shoulders-Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 including all lifts and leads as per Technical Specification Clause 303.1. As per directed by Engineer Incharge. | 2,535.08 | One Cubic Meter | 953.78 ₹24,17,908.6 Lowest |
| 1.05 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location including all lifts and leads as per Technical Specification Clause 302.3, As per directed by Engineer Incharge. | 5,211.76 | One Cubic Meter | 86.36 ₹4,50,087.59 Lowest |
| 1.06 | Construction of Embankment with Material Obtained from Roadway Cutting- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5, As per directed by Engineer Incharge. | 4,170.4 | One Cubic Meter | 98.6 ₹4,11,201.44 Lowest |
| 1.07 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 As per directed by Engineer Incharge. | 919.59 | One Cubic Meter | 127.5 ₹1,17,247.73 Lowest |
| 1.08 | Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 As per directed by Engineer Incharge. | 613.06 | One Cubic Meter | 615 ₹3,77,031.9 Lowest |
| 1.09 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 As per directed by Engineer Incharge. | 306.53 | One Cubic Meter | 105.93 ₹32,470.72 Lowest |
Tender Value
Refer Docs
EMD Value
₹24.3 L
Closing Date
11 Dec 2024, 5:00 pmClosed
Superintending Engineer PMGSY Konkan Region Thane
1st floor in PWD Compound, Near Talvpali, Station road, Thane W 400601
RD-RAI-C295-Dist-Raigad Tal-Poladpur,Mahad,Mangaon -Total 13 works(2nd Call)
2024_MRRDA_1117994_1
MMGSY/Raigad/C295/51/24-25
Open Tender
Civil Works
Item Wise
730 days
poladpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹29,500
₹24.3 L
21 Sept 2026
26 Nov 2024
13 Dec 2024
26 Nov 2024
11 Dec 2024
29 Nov 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .