| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹63.5 L+₹90,736.96 (1.45%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹64.8 L+₹2.2 L (3.54%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹66.6 L+₹4.0 L (6.37%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹70.7 L+₹8.1 L (12.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BASHARAT AHMAD GANAIE L2 | M/S SYED MEHDI SHAH L1 | M/S BILAL AHMAD ZARGER L5 | NAZIR AHMAD HAKAK L4 | M/S BAKHROO CONSTRUCTION CO L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply & laying of stone soling (hand packed) in trenches of foundation incl. ramming and all consequential and incidental costs. Incl. cost & carriage complete job. | 110 | cum | 900 ₹99,000 Lowest | 1,000 ₹1,10,000 | 1,000 ₹1,10,000 | 900 ₹99,000 Lowest | 1,450 ₹1,59,500 |
| 2.00 | Providing and laying of cement concerete of specified grade including curring, but excluding the cost of centering & shuttering all works upto plinth level with 1:3:6 (1:cement:3course sand:6 graded stone crushed agg.20mm nominal size ) | 55.16 | cum | 5,500 ₹3,03,380 | 5,200 ₹2,86,832 | 5,500 ₹3,03,380 | 5,000 ₹2,75,800 Lowest | 7,000 ₹3,86,120 |
| 3.00 | Brick work with common burnt clay (non modular) bricks of class designation 75 in superstructure above plinth level upto floor V level complete. | 6.08 | cum | 9,001 ₹54,726.08 | 8,000 ₹48,640 Lowest | 8,500 ₹51,680 | 8,000 ₹48,640 Lowest | 17,500 ₹1,06,400 |
| 4.00 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | 1,673 | Kg | 77 ₹1,28,821 | 65 ₹1,08,745 Lowest | 78 ₹1,30,494 | 75 ₹1,25,475 | 100 ₹1,67,300 |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with (1:11/2 :3) (1:Cement 11/2 :coarse sand 3: graded stone agg. 20mm nominal size) | 13.94 | cum | 8,000 ₹1,11,520 | 7,500 ₹1,04,550 Lowest | 8,300 ₹1,15,702 | 8,000 ₹1,11,520 | 8,000 ₹1,11,520 |
| 6.00Centering & shuttering including strutting, propping, removal of form work for | ||||||||
| 6.10 | a) Plinth,kerbs,walls (any thickness) and Steps. | 36.14 | Sqm | 302 ₹10,914.28 | 210 ₹7,589.4 | 200 ₹7,228 | 100 ₹3,614 Lowest | 800 ₹28,912 |
| 7.00 | Cement concrete flooring 1:2:4 (1 cement: 2coarse sand : 4 graded stone agg.) finished with a floating coat of neat cement including cement slurry, and curring complete but excluding the cost of nosing of steps etc complete. 50mm thick with 20mm nominal size stone aggergate | 72.86 | sqm | 450 ₹32,787 | 350 ₹25,501 | 350 ₹25,501 | 300 ₹21,858 Lowest | 500 ₹36,430 |
| 8.00 | 15mm cement plaster on the rough side of single or half brick walls of mix 1:6 (1:cement:6 fine sand) for height upto 10 mtrs from ground level. | 1,383 | sqm | 250 ₹3,45,750 Lowest | 280 ₹3,87,240 | 280 ₹3,87,240 | 280 ₹3,87,240 | 250 ₹3,45,750 Lowest |
| 9.00 | 12mm cement plaster mix 1:4(1:cement:4 fine sand) | 728 | Sqm | 250 ₹1,82,000 | 300 ₹2,18,400 | 250 ₹1,82,000 | 250 ₹1,82,000 | 210 ₹1,52,880 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
22 Jan 2021, 4:00 pmClosed
DGM UNIT 8th JKPCC LTD BARAMULLA
DGM UNIT 8th JKPCC LTD BARAMULLA
Finishing work, Flooring, Puff Panel work and M.S. Railing for construction of indoor stadium at Mirgund Pattan
2021_PWDJK_112950_1
62/e-tendering of 2020-21/DGM/8th/Bla
Open Tender
Civil Works
Item Rate
45 days
BARAMULLA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Yes
FC JKPCC LTD A/C
₹1.5 L
Yes
30 Jan 2021
2 Jan 2021
23 Jan 2021
2 Jan 2021
22 Jan 2021
2 Jan 2021
Amount
Supply & laying of stone soling (hand packed) in trenches of foundation incl. ramming and all consequential and incidental costs. Incl. cost & carriage complete job.
Providing and laying of cement concerete of specified grade including curring, but excluding the cost of centering & shuttering all works upto plinth level with 1:3:6 (1:cement:3course sand:6 graded stone crushed agg.20mm nominal size )
Brick work with common burnt clay (non modular) bricks of class designation 75 in superstructure above plinth level upto floor V level complete.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with (1:11/2 :3) (1:Cement 11/2 :coarse sand 3: graded stone agg. 20mm nominal size)
Centering & shuttering including strutting, propping, removal of form work for
a) Plinth,kerbs,walls (any thickness) and Steps.
Cement concrete flooring 1:2:4 (1 cement: 2coarse sand : 4 graded stone agg.) finished with a floating coat of neat cement including cement slurry, and curring complete but excluding the cost of nosing of steps etc complete. 50mm thick with 20mm nominal size stone aggergate
15mm cement plaster on the rough side of single or half brick walls of mix 1:6 (1:cement:6 fine sand) for height upto 10 mtrs from ground level.
12mm cement plaster mix 1:4(1:cement:4 fine sand)
Providing & applying white cement based putty of specified thickness of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth complete (2mm thick)
Finishing with epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers specification incl.approprate priming coat preparation of surface etc complete.
a) on Concrete work
b) on Steel work
Painting with synthetic enamel paint of approved brand and manufacture to given an even shade two or more coat on new work incl. ready mixed pink or gray primer of approved brand & manafucture on wood work hard & soft wood complete job.
Providing & fixing of 8mm thick pvc flooring (vinyl indoor sports flooring BWF certified) the following shall be a multi layer product consisting of top layer as wear layer in GEM pattern of thickness 1.5mm followed by fabire layer dimension stability of the product. The last layer should consist of a foam layer. The flooring to be fixed with water based or rubber based adhesive to ensure better adhesion of the product. The joints of the following to be thermo welded with PVC welding cord of similiar color. The process to be executed by an hot welding process. it should have all sports properties like shock absorbtion, ball rebounding etc. Product should be BWF certified and IAF approved conforming to EN-14904 category PI with shock absorption of 34%
ement concrete flooring 1:2:4 (1 cement: 2coarse sand : 4 graded stone agg.) finished with a floating coat of neat cement including cement slurry, and curring complete but excluding the cost of nosing of steps etc complete. 40mm thick with 20mm nominal size stone aggergate
52mm thick concrete flooring with concrete hardener topping under layer 40mm thick cement concrete 1:2:4(1 cement:2 coarse sand :4 graded stone agg. 20mm nominal size) and top layer 12mm thick cement hardner consisting of mix 1:2 (1 cement hardner mix:2 stone agg 6mm nominal size ( by volume hardening compound mixed @2 liters hardener per 50Kg of cement or as per manafucturers specifications, including cost of cement sulry & curring complete but excl. cost of nosing of steps etc complete.
P/F false ceiling of fiber cement board of size 600mmx600x6mm free from asbestos and environment friendly with high resistance in fire excellent durability and light weight incl.the cost of the durability and light weight incl. the cost of the necessary frame work (Everest or equivalent ) sample to be approved by the in charges at site incl.all consequential and incidental costs like all leads, lifts carriages and scaffolding etc complete job.
Providing and fixing polyurethance insulated PUF panels in walls partitions and in ceilings made out of following thickness, sand which panels made out of 0.5/0.5 mm thick PPGI pre-coated sheet on both sides of PU foam. PUF panels shall be jointed with tongue and groove properly sealed with the help of expanding PU foam must be CFC free. Self extinguishing free retardant type having density of 40 Kgs per cum + 2 Kg thermal conductivity @10o 0.02W/Mo K all gaps ends & corners shall be covered by 0.5mm thick pre-coated flashing so that PUF or joint etc are not visible from inside & outside the PUF panel shall be fixed with frame / structure with the help of SS screws, nuts, bolts or any other approved fixing arrangement complete in all respect as per drawings, design and directions of Engineering incharge incl.all consequential and incidental costs like all leads, lifts carriage and scaffolding complete job.
40mm thick (For Gables With Ground framework in ISA(40x40x6) mm
60mm thick (For sides of walls with Ground framework of ISA(50x50x6)mm
100 mm thick ( For sides of walls with Ground framework of ISA(50x50x6) mm
Providing and fixing hand railing of approved size by welding etc to steel ladder railing balcony railing, stair case railing and similiar works incl.applying priming coat of approved steel primer.(MS tube)
All BOQ items are inclusive of cost & carriage of materail complete job
BASHARAT AHMAD GANAIE
M/S BAKHROO CONSTRUCTION CO
NAZIR AHMAD HAKAK
M/S BILAL AHMAD ZARGER
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .