| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.0 CrAdmitted-Finance GAJAPUR TALUKA SHAHUWADI DISTRICT KOLHAPUR | L1 | Admitted-Finance | ||
| 2 | Not Admitted-Fee/PreQual/Technical 10 VENKTESH ARJUN NAGARI KALAMBA ROAD KOLHAPUR 416012 | KOLHAPUR | MAHARASHTRA | 416012 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 3 | Not Admitted-Fee/PreQual/Technical EMPIRE TOWER DASARA CHOWK KOLHAPUR | KOLHAPUR | KOLHAPUR | MAHARASHTRA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 4 | Not Admitted-Fee/PreQual/Technical PROJECT 34 VRINDAVAN LAYOUT VIDYANAGAR HUBLI 5880021 | HUBLI | DHARWAD | KARNATAKA | 5880021 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹48.0 Cr
EMD Value
₹24.0 L
Closing Date
28 Jul 2026, 5:45 pmClosed
EE MPDU AMBADPAL TAL KUDAL
EE MPDU AMBADPAL TAL KUDAL DIST SINDHUDURG
Construction of Balance works of Tail channel and guide wall from Ch 133 to 850 m of Aruna Medium Irrigation project, Taluka Vaibhavwadi, District Sindhudurg
2026_CWRDK_1317551_1
MPDU/N1/ARUNA/2026-27
Open Tender
Civil Works
Percentage
365 days
ARUNA TAL VAIBHAVWADI
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹24.0 L
30 Sept 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
14 Jul 2026 - 28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1 : Cleaning grass and removal of rubbish upto a distance of 50 metres outside the periphery of the area as directed. | 56,000 | Sqm | 4.85 | ₹2,71,600 |
| 2 | Item No. 2 : Dismantling R.C.C. works and removing the stuff to a distance of 15 m and all lifts including stacking etc. complete as directed. | 789.12 | Cum | 488 | ₹3,85,090.56 |
| 3 | Item No.3 :- Excavation in Soft Strata including boulders up to 0.6 m diameter ( 0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. Complete with lead up to 1 km and all lifts as directed. | 25,679.53 | Cum | 139.27 | ₹35,76,388.14 |
| 4 | Item No.4: Excavation in hard rock of all toughness by breaker including boulders above 0.6 m dia.(0.113Cum) minimising damage to side slopes of excavation and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour, levelling bed etc., complete with lead upto 1 km and all lifts as directed. | 77,038.6 | Cum | 712.7 | ₹5,49,05,410.22 |
| 5 | Item No.5: Providing and fixing anchor bar of 25 mm & 32 mm diameter 3.375 m length with resin bond cement capsule anchorage through shaft including drilling holes. inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with all lifts as Directed. | 7,030 | No. | 3,419.4 | ₹2,40,38,382 |
| 6 | Item No6: Providing and fixing anchor bar of 32 mm diameter 4.32 m length with resin bond cement capsule anchorage through shaft including drilling holes, inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc complete with all lifts as Directed. | 240 | No. | 4,726.8 | ₹11,34,432 |
| 7 | Item No.7: Providing and laying Weep Holes of 100mm Dia. Of PVC as per drawings for Abutments returns, return wall etc. complete | 1,035 | Rmt | 586.3 | ₹6,06,820.5 |
| 8 | Item No.8: Providing and laying Weep Holes of 75mm Dia. Of PVC as per drawings for Abutments returns, return wall etc. complete | 4,366 | Rmt | 439.75 | ₹19,19,948.5 |
| 9 | Item No.9: Providing and laying rubble soling below foundation in layers including filling with rubble chips, murum etc.complete as directed. | 791.47 | Cum | 1,300.25 | ₹10,29,108.87 |
| 10 | Item No.10 :- Providing and Fixing in Position TMT-FE-500 bar reinforcement of various diameters for Rcc Piles cap,footing, foundation,slab ,beam,column, canopies, staircase, newels, chajjas, lintel, pardies, coping,fins, arches etc as per detailed design,drawing and schedules including cutting, bending, hooking the bars,binding with wires or tack welding and supporting as required complete as directed. | 328.77 | M.T. | 90,195.85 | ₹2,96,53,689.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2258610.xls
BOQ • 0.41 MB
tenderform.pdf
Tender Documents • 11.41 MB
corii.pdf
PDF • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .