Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC Work Awarded To L1 Bidder. | |
| 2 | Rejected-Technical RAY RANCHI | RANCHI | JHARKHAND | 829205 | - | Rejected-Technical L2 Bidder. Documents of L2 bidder not scrutinized, as bid of L1 bidder found acceptable technically and financially. | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 Bidder. Douments of L3 bidder not scrutinized, as bid of L1 bidder found acceptable technically and financially. |
Tender Value
₹1.2 L
EMD Value
₹1,500
Closing Date
18 Jun 2022, 5:00 pmClosed
PE(EnM), Ashok OCP
ASHOK OCP PPR AREA
Maintenance reconditioning of 01no. of 150KVA 3.3KV and 440V No 88036 Make Govt. Elect. Factory distribution transformer installed for power supply to weighbridges near pit office area and (2) re winding of 1no. of 250KVA 3.3KV 440V
2022_CCL_246089_1
PO(AK)/PE(EnM)/e-NIT/22-23/06
Open Tender
Electrical and Maintenance Works
Item Rate
6 days
ASHOK OCP
2 documents required · 2 mandatory
₹1,500
Yes
11 Aug 2022
8 Jun 2022
20 Jun 2022
8 Jun 2022
18 Jun 2022
8 Jun 2022
8 Jun 2022 - 14 Jun 2022
Amount
Dismantling of conservator, all terminals (primary & secondary), top cover including draining of transformer oil in drum.
Dismantling of tap changing assembly, repairing all fixed & moving contacts, checking all connections of tap changer, cleaning & assembling etc.
Repairing all the leakage points such as drain valve, bushing, radiator vent pipe conservator, breather cap, tap changer etc. by changing new gasket packing completely.
Replacement of LT side bushing with stud, nut, washer etc.
Assembling of conservator, all terminals (primary & secondary), top cover including refilling of transformer oil in drum.
Transformer oil filtration, commissioning, testing & power charging.
PART 2, 250KVA, 3.3KV/440V TRANSFORMER, Sl. No.- 90821, Make – GEC Copper strip / wire for primary & secondary winding. (Total weight of 3 limbs of copper winding = 250KVA X 0.8 kg / KVA = 200kg, Weight of 2 limbs for repairing = 200kg X 2/3=133.33kg)
Cost of insulation @15% of item no. 7
Labour charge @15% of item no. 7
Less scrap value @60% of item no. 7
Total impact of GST for the purpose of CTC
M/S R.S.VISHAVKARMA WORKS
SS ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .