Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Mar 2022, 4:30 pmClosed
Er Rajesh Gupta
EXECUTIVE ENGINEER REW DIVISION RAMBAN
AS PER NIT
2022_RDPR_161890_28
e fresh NIT no 74 of REW Ramban
Open Limited
Civil Works
Item Rate
30 days
RAMBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW DIVISION RAMBAN
Exempted
17 Mar 2022
23 Feb 2022
3 Mar 2022
23 Feb 2022
2 Mar 2022
23 Feb 2022
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. A). 30 % All kinds of soils
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:4:8 ( 1 cement :4 fine sand :8 graded stone aggregate 40 mm nominal size ) Nallah.
Random Rubble Masonry with hard stone from Nallah in foundation & plinth including levelling up with cement concrete 1:6:12 ( 1 cement :6 coarse sand :12 graded stone agg.20 mm nominal size ) at plinth level with Cement mortar 1:6( 1 cement : 6 coarse sand)
20 mm thick cement of mix 1:4 ( 1 cement :4 fine sand )
1:2.4 (1 cement:2 coarse sand :4 graded stone agg. 20 mm nominal )
Foundations, footings, bases of columns etc for mass concrete
OMKAR SINGH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .