| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.3 L+₹32,342 (3.59%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹9.0 L
EMD Value
₹9,017
Closing Date
4 Mar 2024, 3:00 pmClosed
commissioner madurai corporation
Aringar Anna Maligai
Attending patch work for existing BT road in ward no 75
2024_MAWS_430921_1
E7 / Est.No. 470 / 23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,017
19 Mar 2024
27 Feb 2024
4 Mar 2024
27 Feb 2024
4 Mar 2024
27 Feb 2024
Amount
Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. (Mdu Corporation Data 2023-2024Pg.No.15)
Providing and laying,Spreading and compacting 0.396 m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to Wet Mix Macadam (WMM) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with pavar in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications (Mdu Corporation Data 2023-2024Pg.No.15)
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications. (Mdu Corporation Data 2023-2024 Pg.No.13)
Providing and laying Bituminous Concrete to 40 mm thick using 0.13 cum of 19.00-9.50mm, graded metal 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36 and below metal by adding (160 degree celcious) 60/70 grade for premixing per 10sqm to lay 30mmcompacted thick of Bituminous Concrete including the cost of materials and conveyance of all material to CMP site, heating the bitumen and aggregate to the required temperature and mixing the minimum required Temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-100 KN Vibratory Roller / Pneumatic Roller to their required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler , tipper trucks, paver finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plants required, including all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH Rev -5 specification using. (Mdu Corporation Data 2023-2024 Pg.No.19)
Add GST 18%
SRI VISALAKSHI CO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .