| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.8 LAdmitted-Finance | -0.51% | ₹22.8 L | L1 | Admitted-Finance |
| 2 | L2₹22.9 L+₹5,967.03 (0.26%)Admitted-Finance | -0.25% | ₹22.9 L+₹5,967.03 (0.26%) | L2 | Admitted-Finance |
| 3 | L3₹22.9 L+₹10,557.05 (0.46%)Admitted-Finance | -0.05% | ₹22.9 L+₹10,557.05 (0.46%) | L3 | Admitted-Finance |
Tender Value
₹22.9 L
EMD Value
₹2.3 L
Closing Date
16 Mar 2026, 5:00 pmClosed
Sahkari ganna Vikas Samiti Limited rupapur Hardoi
Sahkari ganna Vikas Samiti Limited rupapur Hardoi
Sahkari ganna Vikas Samiti Limited rupapur hardoi ki Bhumi per boundary wall ka Nirman Karya
2026_CDSI_1121735_2
997/c nirman date 28-02-2026
Open Tender
Civil Works
Percentage
120 days
rupapur Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,180
AS PER NIT
₹2.3 L
Yes
d c o office hardoi
19 Mar 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 117.85 | cum | 187.19 | ₹22,060.34 |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. | 8.21 | cum | 4,898.85 | ₹40,219.56 |
| 3 | As in item 3 above but in R.C.C. Work in footing / foundation and footing with approved stone ballast.(Using 1:1.5:3 Mix concrete) [1 cement :1.5 coarse sand :3 stone aggregate] M-20 | 26.92 | cum | 6,505.25 | ₹1,75,121.33 |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum RAFT | 5.61 | cum | 6,835.34 | ₹38,346.26 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum COLUMN | 12.5 | cum | 7,091.11 | ₹88,638.88 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum BEAM | 11.38 | cum | 6,636.69 | ₹75,525.53 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum BEAM | 2.85 | cum | 7,091.11 | ₹20,209.66 |
| 8 | TMT Fe-500 or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. | 52.86 | qtl | 7,756.03 | ₹4,09,983.75 |
| 9 | M-150 brick work in 1:6 (one cement and Six coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | 11.4 | cum | 5,129.16 | ₹58,472.42 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 59.84 | cum | 6,548.54 | ₹3,91,864.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_2087419.xls
BOQ • 0.29 MB
nivdashudhpatar.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .