Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65.5 LAdmitted-Finance | -0.73% | ₹65.5 L | L1 | Admitted-Finance |
| 2 | L2₹65.7 L+₹15,185.83 (0.23%)Admitted-Finance | -0.50% | ₹65.7 L+₹15,185.83 (0.23%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical rejected |
Tender Value
₹66.0 L
EMD Value
₹1.3 L
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer Construction Division kashmir
Executive Engineer Construction Division kashmir bakhshi Stadium
Construction of Sports Facility at main town Kupwara.
2026_SPORT_315301_1
09 of 2026-27
Open Tender
Civil Works
Percentage
120 days
srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
ex.engineer, CDK
₹1.3 L
10 Aug 2026
9 Jul 2026
30 Jul 2026
9 Jul 2026
29 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Change Room
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: | 55.06 | Cum | 256.85 | ₹14,142.16 |
| 2 | P/L stone soling hand packed incl ramming with heavy rammers all carriage upto site of work | 31.33 | Cum | 1,000 | ₹31,330 |
| 3 | P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level
(1;4;8) stone aggregate 40 mm nominal size crushed aggregate . | 9.01 | Cum | 5,202.9 | ₹46,878.13 |
| 4 | P/L in position cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level (1:2:4) stone aggregate 20mm nominal size aggregate | 11.65 | Cum | 7,104.35 | ₹82,765.68 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 17.98 | Cum | 9,821.25 | ₹1,76,586.08 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 29.4 | Cum | 5,733.6 | ₹1,68,567.84 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,259 | Kgs | 123.2 | ₹4,01,508.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundation, footing, bases for columns | 178.03 | Sqm | 286.35 | ₹50,978.89 |
| 9 | B) Suspended floors roofs, landing balconies and access platform | 66.66 | Sqm | 718.2 | ₹47,875.21 |
| 10 | C) ) Lintel beams plinth beams girders bressumers and cantilevers | 57.05 | Sqm | 577.55 | ₹32,949.23 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_1022367.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .