| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9.8 Laccepted-aoc | ₹9.8 L | accepted-aoc |
Tender Value
₹10.0 L
EMD Value
₹9,990
Closing Date
19 Aug 2026, 5:00 pmClosed
Executive Engineer Irr Div no 2 Hanumakonda
O/o IRRIGATION DIVISION NO.02, NAKKALAGUTTA, HANUMAKONDA
Improvements and Repairs to the Weir of Nimmaya Cheruvu, Mattewada(V), Warangal (M), Warangal District (1st Call)
723703
09/2026-27, Date: 04.08.2026
OPEN
Civil Engineering Works
WARANGAL (URBAN)
7 documents required · 7 mandatory
₹354
₹9,990
26 Aug 2026
4 Aug 2026
5 Aug 2026
Rupees Nine lakhs ninty eight thousand four hundred twenty four only
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete. (For Bund)
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,Depth upto 3 m dressing of sides and bottom and backfilling with approved material. (For Weir)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundationfilling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing inposition, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (For Weir)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (For Weir)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule A-Nimmay Cheruvu.xls
TENDER_DOCUMENT • 0.75 MB
BOQ-Nimmaya Cheruvu.xls
TENDER_DOCUMENT • 0.56 MB
NImmay cheruvu, Tender booklet.docx
TENDER_DOCUMENT • 0.38 MB
NIT-Nimmay cheruvu.docx
TENDER_DOCUMENT • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .