| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance BHARSATHI VARANASI UTTAR PRADESH | MUZAFFARNAGAR | UTTAR PRADESH | 247771 | -18.00% | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹75,637.50 (0.74%)Admitted-Finance LUCKNOW | UTTAR PRADESH | 226020 | -17.39% | ₹1.0 Cr+₹75,637.50 (0.74%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹3.7 L (3.66%)Admitted-Finance | -15.00% | ₹1.1 Cr+₹3.7 L (3.66%) | L3 | Admitted-Finance |
| 4 | L3₹1.1 Cr+₹3.7 L (3.66%)Admitted-Finance | -15.00% | ₹1.1 Cr+₹3.7 L (3.66%) | L3 | Admitted-Finance |
| 5 | L3₹1.1 Cr+₹3.7 L (3.66%)Admitted-Finance E 58 61 PHASE 1 ASHOK VIHAR COLONY PAHARIYA DISTRICT VARANASI | VARANASI | VARANASI | UTTAR PRADESH | -15.00% | ₹1.1 Cr+₹3.7 L (3.66%) | L3 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹7.3 L
Closing Date
24 Apr 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD S. 24 RAMDATPUR ANTERGAT KALPNA VIHAR COLONY ME CC MARG V CC BLOCK NALI LAGANE KA KARY
2026_NNVAR_1136653_39
01_cmnsy_VRS
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹12,400
TENDER COST, Account no- 50100642535388
₹7.3 L
15 Jul 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1okMZ la0 24 jenRriqj vUrxZr dYiukFk fogkj dkyksuh es lh0lh0 ekxZ o lh0lh0 Cykd ukyh yxkus dk कार्यA | |||||
| 1.01 | E/W in cutting cartage & filling from outside 8.00 km including all cost complete(Analysed) | - | M3 | - | - |
| 1.02 | Providing and laying Cement concrete 1:6:12( 1 cement : 6 fine sand : 12 graded brick ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. SOR SI No. 273 | - | M3 | - | - |
| 1.03 | First class bricks work in 1:4 in cement and coarse sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SOR SI No. 305(b) | - | M3 | - | - |
| 1.04 | Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone ballast 40 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.S.I.No-281. | - | CUM | - | - |
| 1.05 | S/L of 125 micron polythene sheet under the foundation or sub base to act as seperation between sub base and concrete slab (for cc road slab) etc | - | M2 | - | - |
| 1.06 | Laying of CC Road slab consisting of 1:1.5:3 cement coarse sand and approved 20 mm gauge stone ballast over prepared sub grade after its rectification & bringing etc as per sor si no 773B | - | M3 | - | - |
| 1.07 | Supply & fixing of precast CC block KC drain with PCC base concrete etc all comp. | - | Rmt | - | - |
| 1.08 | S/L of GSB site including consolidation water allawance etc materials and labour T & P etc all complete work | - | CUM | - | - |
| 1.09 | Supply & Laying of rubber moulded80mm thick CC interlocking pavor block with 30mm local sand & 40 mpa strenght etc all comp. GRAY | - | SQM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
td01t2.pdf
Tender Documents • 8.22 MB
BOQ_2126458.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .