Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.3 LAccepted-Finance MAIRAKATA P O GARBETA DIST PASCHIM MEDINIPUR 721127 | GARBETA | PASCHIM MEDINIPUR | WEST BENGAL | 721127 | ₹57.3 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹58.5 LRejected-Finance 1ST FLOOR BL 8 6 DR B C ROY SARANI JYANGRA BAGUIHATI KOLKATA 700059 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700059 | ₹58.5 L | L2 | Rejected-Finance 2nd LOWEST BIDDER |
| 3 | L3₹58.7 LRejected-Finance GR 8 ADDA BUILDING 1ST FLOOR CITY CENTRE DURGAPUR 16 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | ₹58.7 L | L3 | Rejected-Finance 3rd LOWEST BIDDER |
| Sl No | Description | Qty | Unit | R.K.ENTERPRISE L1 | DURGAPUR POWER L3 | M/S S. CHATTERJEE L2 |
|---|---|---|---|---|---|---|
| 1.00SITC of 60 KVA Online UPS systems with battery back up for 30 mins incl. S&F of Open battery rack & battery interlink cable, Fire-retardant SMF 12V batteries disconnector for battery protection, M.S Rack for battery, DC MCCB, interlinks and Stranded flexible copper cable for DC connectin upto 10mtrs from UPS to batteries as per following : -Make- Numeric by Legrand, Model: Kero MP 60 KVA of equivelent model of APC/ Vertiv] UPS Capacity in KVA: 60 KVA/KW @40Deg C Output PF: 1 @40Deg C Configuration: Parallel Redundant Type-upto 4 Units UPS Topology: DSP based IGBT Rectifier & Inverter. UPS Configuration: 03:03 (3 Phase in & 3 Phase Out) Input Parameters: Input Operating Voltage Range: 400V -22.5%+15% for 100% Load - 3 phase Input frequency tolerance: 40-70 Hz Recetifier Technology: IGBT Based Rectifire switchning Frequency: 10-20 kHZ Input current distoration at rated input current at full load: <3% Input power factor at full load: >0.99 | ||||||
| 1.01 | Output Parameters:
Rate out-put voltage: 380/400/415V
Rated output frequency: 50/60 Hz
Steady state voltage regulation: Balance load 100% unbalanced load: ± 2% for balanced load, ± 4% for 100% unbalanced
Output voltage adjustement range: Settable to 380/400/415V
Output power factor ranage: 0.6 lead to 0.6 lag without derating
THDv: <1% for 100% linear load, <5.5% for 100% non linear load
Crest Factor: 3:1
Overload 110%: 30mins
Battery:
Battery Back-up time: 30 Minutes @ 0.8 load Power Factor
Total VAH for 30 Minutes Back-up: Should be 52800 VAH ( 44 Nos. 100AH or Equivelent) or higher
Battery Type: 12V VRLA (Valve Regulated Lead Acid) Sealed Maintenance-Free battery with flame-retardant container conforming to UL-94 V0 grade [Make: Exide NXT+ or equivalent model of Amaron]
Mechnical Construction:
IP Protection Class: IP20
In-built Input/Output/Bypass/Maintainence Bypass Isolators: Required (in-built) Charger Capacity minimum 25A Back feed Protection Storage temperature : -20Deg C to 70Deg C **Self capacity test or 100% capacity test with external load at site shall be carried out by the bidder | 2 | Items | 18,20,000 ₹36.4 L | 18,45,990 ₹36.9 L | 18,10,000 ₹36.2 L |
| 2.00SITC of 80 KVA Online UPS systems with battery back up for 30 mins each with in-built/External isolation transformer, Open battery rack & battery interlink cable incl S & F of Fire-retardant SMF 12V batteries disconnector for battery protection, M.S Rack for battery, DC MCCB, interlinks and Stranded flexible copper cable for DC connectin upto 10mtrs from UPS to batteries as per following : -Make- Numeric by Legrand, Model: Kero MP 80 KVA of equivelent model of APC/ Vertiv] UPS Capacity in KVA: 80KVA/KW @40Deg C Output PF: 1 @40Deg C Configuration: Parallel Redundant Type-upto 4 Units UPS Topology: DSP based IGBT Rectifier & Inverter. UPS Configuration: 03:03 (3 Phase in & 3 Phase Out) Input Parameters: Input Operating Voltage Range: 400V -22.5%+15% for 100% Load - 3 phase Input frequency tolerance: 40-70 Hz Recetifier Technology: IGBT Based Rectifire switchning Frequency: 10-20 kHZ Input current distoration at rated input current at full load: <3% Input power factor at full load: >0.99 | ||||||
| 2.01 | Output Parameters:
Rate out-put voltage: 380/400/415V
Rated output frequency: 50/60 Hz
Steady state voltage regulation: Balance load 100% unbalanced load: ± 2% for balanced load, ± 4% for 100% unbalanced
Output voltage adjustement range: Settable to 380/400/415V
Output power factor ranage: 0.6 lead to 0.6 lag without derating
THDv: <1% for 100% linear load, <5.5% for 100% non linear load
Crest Factor: 3:1
Overload 110%: 30mins
Battery:
Battery Back-up time: 30 Minutes @ 0.8 load Power Factor
Total VAH for 30 Minutes Back-up: Should be 72000 VAH ( 50 Nos. 120 AH or Equivelent) or higher
Battery Type: 12V VRLA (Valve Regulated Lead Acid) Sealed Maintenance-Free battery with flame-retardant container conforming to UL-94 V0 grade [Make: Exide NXT+ or equivalent model of Amaron]
Mechnical Construction:
IP Protection Class: IP20
In-built Input/Output/Bypass/Maintainence Bypass Isolators: Required (in-built) Charger Capacity minimum 25A Back feed Protection Storage temperature -20Deg C to 70Deg C Self capacity test or 100% capacity test with external load at site on Bidder scope
**Self capacity test or 100% capacity test with external load at site shall be carried out by the bidder | 1 | Item | 20,90,871 ₹20.9 L | 21,80,920 ₹21.8 L | 22,30,001 ₹22.3 L |
| 3.00Terms & Conditions: 1. The agency must procure the material from the manufacturer/OEM or from their authorised sales channel so that the standard warranty/support of the manufacturer/OEM becomes applicable to the product and to be delivered and installed by them. 2. Documents that authenticate such procurement from the manufacturer/OEM or from their authorised sales channel so that the standard warranty/support should be send from the E-Mail of the manufacturer/OEM or from their authorised sales channel to the email of EIC. and hard copy of it to be submitted during execution of work/submission of bill. 3. If any refurbished material is supplied and installed, penal action will be taken as per existing rule 4. The standard warranty of the UPS & Battery should be 2 years from the date of installation. 5. Self capacity test or 100% capacity test with external load at site shall be carried out by the bidder | ||||||
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
27 Jan 2026, 10:30 amClosed
SE,SWEC,PWD, MIDNAPORE
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound,Midnapore,Paschim Medinipur
SITC of UPS system for OT Complex, ICCU, CCU, HDU and various critical care block at PMSSY Building under Bankura Sammilani Medincal College and Hospital in the district of Bankura.
2026_WBPWD_987412_1
WBPWD/SE/SWEC/NIQ33/2025-26
Open Tender
ELECTRICAL WORKS ORG
30 days
BANKURA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1.1 L
OFFICE OF THE SE,SWEC,PWD,MIDNAPORE
22 Jun 2026
13 Jan 2026
29 Jan 2026
13 Jan 2026
27 Jan 2026
15 Jan 2026
15 Jan 2026
SITC of 60 KVA Online UPS systems with battery back up for 30 mins each with in-built/External isolation transformer, Open battery rack & battery interlink cable incl S & F SMF 12V batteries disconnector for battery protection, M.S Rack for battery, DC MCCB, interlinks and Stranded flexible copper cable for DC connectin upto 10mtrs from UPS to batteries as per following : -Make- Numeric by Legrand, Model: Kero MP 60 KVA of equivelent model of APC/ Vertiv] UPS Capacity in KVA: 60 KVA. Output PF: 1 Configuration: Parallel Redundant Type-upto 6 Units UPS Topology: DSP based IGBT Rectifier & Inverter. UPS Configuration: 03:03 (3 Phase in & 3 Phase Out) Input Parameters: Input Operating Voltage Range: 400V -22.5%+20% for 100% Load - 3 phase Input frequency tolerance: 40-70 Hz Recetifier Technology: IGBT Based Rectifire switchning Frequency: 40 kHZ Input current distoration at rated input current at full load: <3% Input power factor at full load: >0.99
Output Parameters: Rate out-put voltage: 380/400/415V Rated output frequency: 50/60 Hz Steady state voltage regulation: Balance load 100% unbalanced load: ± 2% for balanced load, ± 4% for 100% unbalanced Output voltage adjustement range: Settable to 380/400/415V Output power factor ranage: 0.6 lead to 0.6 lag without derating THDv: <1% for 100% linear load, <5.5% for 100% non linear load Crest Factor: 3:1 Overload 110%: 30mins Battery: Battery Back-up time: 30 Minutes @ 0.8 load Power Factor Total VAH for 30 Minutes Back-up: Should be 52800 VAH ( 44 Nos. 100AH or Equivelent) or higher Battery Type: 12V VRLA Sealed Maintainance Free Battery (Blast Proof) Mechnical Construction: IP Protection Class: IP20 In-built Input/Output/Bypass/Maintainence Bypass Isolators: Required (in-built)
SITC of 80 KVA Online UPS systems with battery back up for 30 mins each with in-built/External isolation transformer, Open battery rack & battery interlink cable incl S & F SMF 12V batteries disconnector for battery protection, M.S Rack for battery, DC MCCB, interlinks and Stranded flexible copper cable for DC connectin upto 10mtrs from UPS to batteries as per following : -Make- Numeric by Legrand, Model: Kero MP 80 KVA of equivelent model of APC/ Vertiv] UPS Capacity in KVA: 80 KVA. Output PF: 1 Configuration: Parallel Redundant Type-upto 6 Units UPS Topology: DSP based IGBT Rectifier & Inverter. UPS Configuration: 03:03 (3 Phase in & 3 Phase Out) Input Parameters: Input Operating Voltage Range: 400V -22.5%+20% for 100% Load - 3 phase Input frequency tolerance: 40-70 Hz Recetifier Technology: IGBT Based Rectifire switchning Frequency: 40 kHZ Input current distoration at rated input current at full load: <3% Input power factor at full load: >0.99
Output Parameters: Rate out-put voltage: 380/400/415V Rated output frequency: 50/60 Hz Steady state voltage regulation: Balance load 100% unbalanced load: ± 2% for balanced load, ± 4% for 100% unbalanced Output voltage adjustement range: Settable to 380/400/415V Output power factor ranage: 0.6 lead to 0.6 lag without derating THDv: <1% for 100% linear load, <5.5% for 100% non linear load Crest Factor: 3:1 Overload 110%: 30mins Battery: Battery Back-up time: 30 Minutes @ 0.8 load Power Factor Total VAH for 30 Minutes Back-up: Should be 72000 VAH ( 50 Nos. 120 AH or Equivelent) or higher Battery Type: 12V VRLA Sealed Maintainance Free Battery (Blast Proof) Mechnical Construction: IP Protection Class: IP20 In-built Input/Output/Bypass/Maintainence Bypass Isolators: Required (in-built)
Terms & Conditions: 1. The agency must procure the material from the manufacturer/OEM or from their authorised sales channel so that the standard warranty/support of the manufacturer/OEM becomes applicable to the product and to be delivered and installed by them. 2. Documents that authenticate such procurement from the manufacturer/OEM or from their authorised sales channel so that the standard warranty/support should be send from the E-Mail of the manufacturer/OEM or from their authorised sales channel to the email of EIC. and hard copy of it to be submitted during execution of work/submission of bill. 3. If any refurbished material is supplied and installed, penal action will be taken as per existing rule 4. The standard warranty of the UPS & Battery should be 2 years from the date of installation.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_2411846.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid