Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹46.0 L+₹4.7 L (11.5%)Rejected-Finance HN 2 PREETI NAGAR PHASE II FAIZULLAGANJ LUCKNOW UTTAR PRADESH 226020 | LUCKNOW | UTTAR PRADESH | 226020 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹46.1 L+₹4.8 L (11.7%)Rejected-Finance C 88 NIRALA NAGAR NEAR 8 NO CHAURAHA LUCKNOW 226 020 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226020 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹46.3 L+₹5.0 L (12.2%)Rejected-Finance | L4 | Rejected-Finance Being L4 |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
17 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE E/M Lucknow
Garrison Engineer E/M, 36 LBS Marg, Lucknow Cantt, Lucknow (U.P.) PIN 226002
PROVN OF RETROFIT EMISSION CONTROL DEVICE (RECD) FOR 625 KVA, 220 KVA AND 160 KVA DIESEL GEN SET INSTALLED AT CH (CC) AND 13 X 1.5 TR SPLIT TYPE AC FOR HQ CELZ AND LIBRARY OF HQ MUPSA UNDER GE E/M LUCKNOW
2023_MES_595751_2
GE/EM/LKO/HOSP/T-07 OF 2023-2024
Open Tender
Miscellaneous Works
Item Rate
180 days
Lucknow
b(i) and c(i)
8 documents required · 8 mandatory
₹500
Yes
GE E/M Lucknow
₹89,000
Yes
27 Jul 2023
1 Jun 2023
19 Jun 2023
1 Jun 2023
17 Jun 2023
5 Jun 2023
Amount
Supplying installation, testing and comissionig of Retrofit Emission Control Device (RECD) in existing 625 KVA/500KW DG Set by welding of suitable size angle for support setructure and suitable size lader includng cutting of old silencer/ mufflur without damaging diesel Generator set and fixing of new Retrofit Emission Control Device by making necessery modification and painting the new assemably to match existing colour of DG Set. The Following technical specification and Certification as under: 1) Technology: DPF (Diesel Particulate filter), Wet Scrubbing, Diesel Oxides Catalyst type 2) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency : Minimum 70% for all DG Sets 3) Maximum back pressure of 8,500 Pa exerted by the Emission Control retrofit device at max prescribed load by DG OEM(as per the capacity of the DG set). Necessary precautions to be taken in exhaust scheme design to avoid condensate/steam back entry to DG sets which is/are not in operation 4) General Technical Requirements for Commissioning Retrofit Emission Control Device (RECD) a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device. b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust. c) Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc. d) Automatic Mains Failure (AMF) control panel, where applicable, shall be able to start up the Emission Control retrofit device without requiring any human intervention. Similarly on restoration of mains supply, it shall be able to turn off automatically. e) The Emission Control retrofit device shall be with corrosion resistive and Heat Resistance paint. f) Standard set of tools consisting of a set of 3 spanners, one screw driver, one standard plier and one nose plier of appropriate size shall be provided along with each Emission Control retrofit device. 5. The installation work of Emission Control Retrofit Device to the extent possible, CPWD General Specification for Electrical Works, Part - VII -latest. Note:- 1. Test Reports and Certification of the Emission Control retrofit device will be from CPCB, recognised/ approved laboratories 2) Warranty on Complete Set (12 Month) 3) Warranty in running hours(1000Hours) 4) Number of preventive maintenance visits offered in a year during warranty period 2 Visits 5) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way. 6 The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set. 7) Exhaust piping, extra civil work shall be provided by the seller
Supplying installation, testing and comissionig of Retrofit Emission Control Device (RECD) in existing 220 KVA/176KW DG Set by welding of suitable size angle for support setructure and suitable size lader includng cutting of old silencer/ mufflur without damaging diesel Generator set and fixing of new Retrofit Emission Control Device by making necessery modification and painting the new assemably to match existing colour of DG Set. The Following technical specification and Certification as under: 1) Technology: DPF (Diesel Particulate filter), Wet Scrubbing, Diesel Oxides Catalyst type 2) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency : Minimum 70% for all DG Sets 3) Maximum back pressure of 8,500 Pa exerted by the Emission Control retrofit device at max prescribed load by DG OEM(as per the capacity of the DG set). Necessary precautions to be taken in exhaust scheme design to avoid condensate/steam back entry to DG sets which is/are not in operation 4) General Technical Requirements for Commissioning Retrofit Emission Control Device (RECD) a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device. b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust. c) Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc. d) Automatic Mains Failure (AMF) control panel, where applicable, shall be able to start up the Emission Control retrofit device without requiring any human intervention. Similarly on restoration of mains supply, it shall be able to turn off automatically. e) The Emission Control retrofit device shall be with corrosion resistive and Heat Resistance paint. f) Standard set of tools consisting of a set of 3 spanners, one screw driver, one standard plier and one nose plier of appropriate size shall be provided along with each Emission Control retrofit device. 5. The installation work of Emission Control Retrofit Device to the extent possible, CPWD General Specification for Electrical Works, Part - VII -latest. Note:- 1. Test Reports and Certification of the Emission Control retrofit device will be from CPCB, recognised/ approved laboratories 2) Warranty on Complete Set (12 Month) 3) Warranty in running hours(1000Hours) 4) Number of preventive maintenance visits offered in a year during warranty period 2 Visits 5) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way. 6 The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set. 7) Exhaust piping, extra civil work shall be provided by the seller
Supplying installation, testing and comissionig of Retrofit Emission Control Device (RECD) in existing 160 KVA/125KW DG Set by welding of suitable size angle for support setructure and suitable size lader includng cutting of old silencer/ mufflur without damaging diesel Generator set and fixing of new Retrofit Emission Control Device by making necessery modification and painting the new assemably to match existing colour of DG Set. The Following technical specification and Certification as under: 1) Technology: DPF (Diesel Particulate filter), Wet Scrubbing, Diesel Oxides Catalyst type 2) Guaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency : Minimum 70% for all DG Sets 3) Maximum back pressure of 8,500 Pa exerted by the Emission Control retrofit device at max prescribed load by DG OEM(as per the capacity of the DG set). Necessary precautions to be taken in exhaust scheme design to avoid condensate/steam back entry to DG sets which is/are not in operation 4) General Technical Requirements for Commissioning Retrofit Emission Control Device (RECD) a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of the exhaust passes through the Emission Control retrofit device. b) Anti-Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust. c) Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc. d) Automatic Mains Failure (AMF) control panel, where applicable, shall be able to start up the Emission Control retrofit device without requiring any human intervention. Similarly on restoration of mains supply, it shall be able to turn off automatically. e) The Emission Control retrofit device shall be with corrosion resistive and Heat Resistance paint. f) Standard set of tools consisting of a set of 3 spanners, one screw driver, one standard plier and one nose plier of appropriate size shall be provided along with each Emission Control retrofit device. 5. The installation work of Emission Control Retrofit Device to the extent possible, CPWD General Specification for Electrical Works, Part - VII -latest. Note:- 1. Test Reports and Certification of the Emission Control retrofit device will be from CPCB, recognised/ approved laboratories 2) Warranty on Complete Set (12 Month) 3) Warranty in running hours(1000Hours) 4) Number of preventive maintenance visits offered in a year during warranty period 2 Visits 5) Unloading and placement of the Emission Control retrofit device at the time of delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way. 6 The seller shall provide the trial run (Testing) of Emission Control retrofit device. The seller shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set. 7) Exhaust piping, extra civil work shall be provided by the seller
Supply, installing, commissioing and testing , split Air Conditioner of capacity 1.5 TR inverter type (Hot & Cold), 5 star rating with inbuilt air ioniser and plasma filter, rotary compressor,auto clean function, indoor sound level 32 db, front panel display, wireless LCD remote, precoated aluminium fins, , auto fan speed, electric driven , suitable for working on 230 volts, single phase, 50 Hz supply complete including remote operation complete all as specified and directed. The rate is included for following item-: (a) Fixing the cooling unit with grouting nuts, cutting groove to wall for gas pipe & water drainage pipe (b) S&F cutting, bent to shape copper pipe of appropriate size from outdoor unit to indoor unit by cutting holes to wall including brazing the copper pipe fixing union including making good disturbed surfaces as existing. (c) S&F PVC pipe 20 mm dia transparent flexible heavy duty for water drainage pipe of upto 06 RM at site. (d) Insulation of both the copper pipes with insulating material and covering the complete pipe with PVC casing & caping of size 75 x 75 mm/reqd size for mechanical protection of copper pipe complete. (e) Charging of correct qty of refrigerant gas after necessary brazing/fixing of both the outdoor/indoor unit and testing complete on load to obtain 18 degree celsius temperature at specified amps. (f) All other connected civil work like hole cutting & other misc work reqd for installation of split AC for proper functioning as directed by EIC. (g) outdoor AC portion to be fixed on wall mounted stand as suitable for fixing of AC.
Supply and install voltage stabilizer automatic boost/buck transformer for low and high voltage with electronic transistorised relay/time relay for twin min, SP, 50 HZ with volt meter indicator digital type and input voltage 140 to 280 and cut up voltage 215 to 240 V capacity 4 KVA, complete all as specified and directed.
S&F plug and socket DBs with Single pole MCB rated 32 Amps capacity with socket plug top 2 pin and earth plug complete all as specified of standered make including making good disturbed surface of wall etc complete all as specified and directed.
M&L for sub main wiring comprising two single core, 4 sqmm nominal cross sectional area multistranded copper conductor cable, PVC insulated unsheathed 1100 volts grade drawing in and including 25 mm dia. PVC conduits and conduit fittings complete (surface type) including 4 sqmm nominal cross sectional area multistranded copper conductor cable, PVC insulated unsheathed 1100 volts grade earth wire complete all as specified and directed. (NOTE :- Extra length of cables/wire required for connection to MCB shall not be measured and the rate quoted by contractor for per unit shall be deemed accordingly)
M&L for sub main wiring comprising two single core, 10 sqmm nominal cross sectional area multistranded copper conductor cable, PVC insulated unsheathed 1100 volts grade drawing in and including 25 mm dia. PVC conduits and conduit fittings complete (surface type) including 10 sqmm nominal cross sectional area multistranded copper conductor cable, PVC insulated unsheathed 1100 volts grade earth wire complete all as specified and directed. (NOTE :- Extra length of cables/wire required for connection to MCB shall not be measured and the rate quoted by contractor for per unit shall be deemed accordingly)
S&F 8 way DB SPN double door with 200 Amps rated bus bar complete all as specified and directed.
S&F MCB SP 6-32 Amps 230 volts, C series with breaking capacity 10 KA complete all as specified and directed.
S&F MCB SPN 63 Amps 230 volts, C series with breaking capacity 10 KA complete all as specified and directed.
Ajanta Associates
LUMOS INFRA PVT LTD
Puma Power
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .