| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance KAGAY BAZAAR BANGLU DARA NORTH PABAK KAGEY KHASMAHAL KALIMPONG | DARJEELING | WEST BENGAL | 734001 | ₹2.9 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹3.0 L+₹5,308.04 (1.82%)Rejected-Finance KAGAY BENDA KALIMPONG 734301 | KALIMPONG | KALIMPONG | WEST BENGAL | 734301 | ₹3.0 L+₹5,308.04 (1.82%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹3.0 L+₹6,182.99 (2.12%)Rejected-Finance | ₹3.0 L+₹6,182.99 (2.12%) | L3 | Rejected-Finance L3 bidder |
Tender Value
₹2.9 L
EMD Value
₹5,833
Closing Date
20 Jul 2026, 6:55 pmClosed
Pradhan Kagay Gram Panchayat
Kagay Gram Panchayat Office, Gendong.
Construction of Community Sanitary Complex at Kagay Christian Church, Gendong, within Kagay G.P.
2026_GTA_1032128_3
. NIeT No.07/XVCFC/KGP/2026, (2nd Call) Dated.13/07/2026
Open Tender
CIVIL WORKS
Percentage
Gendong, Kagay
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹5,833
Yes
21 Aug 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | 1 | m3 | 119.27 | ₹119.15 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and
ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). | - | m3 | 77.54 | - |
| 3 | Filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating the same by thorough
saturation with water ramming complete including the cost of supply of sand. (Payment to be made om measurement of finished
quantity). | 1 | m3 | 1,441.11 | ₹1,439.67 |
| 4 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the
interstics without rolling but including ramming. | 1 | m2 | 50 | ₹49.95 |
| 5 | Cost of stone boulder 150 mm size delivered ans stacked at site. | - | m3 | 1,526.4 | - |
| 6 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor.
(a) 1:3:6 proportion
(B) With N.B. Variety stone metal | 1 | m3 | 5,840.38 | ₹5,840.38 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if
any, in ground floor as per relevant IS codes. (Pakur Variety) | - | m3 | 7,325.17 | - |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard
wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight
including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick
wooden shuttering as per decision & direction of Engineer-In-Charge. | 1 | m2 | 400.8 | ₹400.4 |
| 9 | Reinforcement for reinforced concreate work in all sorts of structures including ditribution bars, stirrups, binders, etc. initial
straightening and removal of loose rust (if necessary ), cutting to requisite length, hooking and bending to correct shape, placing
in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and
direction.(a)For works in foundation, basement and upto roof of ground floor/ upto 4m. (Tor steel/ Mild steel) I. ( JSW / JSPL /
SHYAM / SRMB / BMASL / ELCTROSTEEL / SSL.) | 0.26 | MT | 71,943.38 | ₹18,466.5 |
| 10 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth. | - | m3 | 7,685.48 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.17 MB
BOQ_2534536.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .