Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹28.4 L+₹70,381.83 (2.54%)Rejected-Finance | L2 | Rejected-Finance AER |
Tender Value
₹28.0 L
EMD Value
₹30,000
Closing Date
26 Sept 2023, 3:00 pmClosed
Additional Collector, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Construction of Side Drainage with cover slab at Srilankan Refugees Campus and strengthening of road at Thatchur Panchayat in West Arni Block under Srilankan Refugee Campus Basic Amenities fund in Package No.TVM/2022-23/04
2023_RDTN_369117_1
No. A8/4341/2021 Date.06.09.2023
Open Tender
Civil Works - Others
Item Wise
60 days
west Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹30,000
20 Oct 2023
12 Sept 2023
26 Sept 2023
12 Sept 2023
26 Sept 2023
12 Sept 2023
Amount
Part I : Construction of Side Drainage with cover slab at Srilankan Refugees Campus inside in Thatchur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and coveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Supplying and errection of centering for sides and soffits with M.S sheet and country wood props including hire charges for materials and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and coveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Plastering with Cement Mortar 1:4 (one cement and four sand) 20mm. Thick in all floors including curing etc., complete complying with standard specification and as directed.
Casting and fixing RCC pre cast slab-75 mmthick in CC 1:2:4 using 20mm HBGS excluding cost of Reinforcemetn grill inposition including moulding curing and finishing etc., complete compying with standard specifications.
Part II : Construction of Side Drainage at Srilankan Refugees Campus outside in Thatchur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and coveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Supplying and errection of centering for sides and soffits with M.S sheet and country wood props including hire charges for materials and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and coveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Plastering with Cement Mortar 1:4 (one cement and four sand) 20mm. Thick in all floors including curing etc., complete complying with standard specification and as directed.
Casting and fixing RCC pre cast slab-75 mmthick in CC 1:2:4 using 20mm HBGS excluding cost of Reinforcemetn grill inposition including moulding curing and finishing etc., complete compying with standard specifications.
Part III : Strengthening of Road from Sadhuperipalayam Road to Narikuravar Colony Km 0/0 - 0/412 in Thatchur Panchayat
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications. SS20A
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25 MM THICK USING Plastic waste cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing HM Stones
Road Marking with Hot applied thermoplastic
Providing Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kannan Construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .