Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical MOHALLA KHATIKHAN MEERUT | Accepted-Technical Technically Accepted |
| 2 | Accepted-Technical | Accepted-Technical Technically Accepted |
Tender Value
₹10.3 L
EMD Value
₹1.0 L
Closing Date
28 Sept 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, MINOR IRRIGATION MORADABAD
MI DIVISION OFFICE, BEHIND VIVEKANAND HOSPITAL, KANTH ROAD, MORADABAD
RWH BJN 09 Janpad Bijnor ke Vikas Khand Haldaur evam Noorpur me Rainwater Harvesting Pranali ki Sthapna ka Karya (Cluster No. 09), Prathmik Vidyalay Pota Haldaur, Composite Vidyalay Wajidpur Haldaur, Composite Vidyalay Rampur Rasulpur Noorpur, Compos
2026_UPMID_1187705_9
13/E.E/2026-27 DATED 01.09.2026
Open Tender
Civil Works
Percentage
90 days
BIJNOR
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
EXECUTIVE ENGINEER, MINOR IRRIGATION MORADABAD
₹1.0 L
23 Oct 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling C.C work including clearing and staking of material within 60.0 mtr. | 10.7 | Cum | 246 | ₹2,631.46 |
| 2 | Earthwork in Excavation of Ordinary soil and Soil mixed with Kankar. | 63.6 | Cum | 132 | ₹8,394.8 |
| 3 | P/Laying of Cement Concrete with 1:4:8 Cement, sand, stone ballast (20-50 MM) including cost of material at site Labour, T&P etc. required for proper completion of work | 6.23 | Cum | 5,087.1 | ₹31,697.72 |
| 4 | Laying of P.V.C pipes including jointing ,coupling, cutting for making correct length | 144 | Mtr | 13 | ₹1,872 |
| 5 | M -150 brick work in 1:4 (cement and coarse sand of 2.25 F.M. mortar)in foundation and plinth including supply of materials , labour and T& P etc. required for proper completion of work . | 31.28 | Cum | 5,420 | ₹1,69,548.44 |
| 6 | P/Laying of Cement concrete with 2cm guage stone grit course sand & cement in proportion of 4:2:1 including supply of materials , labour and T& P etc. required for proper completion of work . | 12.68 | Cum | 6,145.2 | ₹77,914.99 |
| 7 | Plaster Work in 1:4 Cement Sand Mortar Over Brick Masonary including supply of materials , labour and T& P etc. required for proper completion of work . | 286.8 | Sqm | 191.9 | ₹55,037.69 |
| 8 | 3.5cm thick cement concrete in roof grouting with 1:2:4 cement coarse sand and 4.75-10mm stone grite and including water proofing materials including supply of materials, labour and T&P etc. required for proper completion of work | 762.08 | SQM | 370.1 | ₹2,82,045.07 |
| 9 | R.C.C.work with cement approved coarse sand and 2 cm gauge stone grit in proportion 1:1.5:3 for slabs excluding supply of rainforcement & its bending but including fixing ,supplyand binding with binding wire necessary centering and shuttering etc and supply of materials , labour and T& P etc. required for proper completion of work . | 3.75 | Cum | 7,059.3 | ₹26,458.26 |
| 10 | Mild steel /iron work such as R.C.C. work rainforcement as per item | 3.53 | QTL | 6,530 | ₹23,057.43 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.22 MB
BOQ_2236627.xls
BOQ • 0.35 MB
09.pdf
Tender Documents • 2.72 MB
13.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .