Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | ₹16.4 L Quoted ₹17 L | L1 | Accepted-AOC aoc |
| 2 | L2₹17 LSame as L1Rejected-Finance 10 118 INDIRA NAGAR DISTT LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹17 LSame as L1 | L2 | Rejected-Finance NOT SELECTED BY ONLINE LOTTERY |
| 3 | L2₹17 LSame as L1Rejected-Finance | ₹17 LSame as L1 | L2 | Rejected-Finance NOT SELECTED BY ONLINE LOTTERY |
| 4 | L2₹17 LSame as L1Rejected-Finance PLOT NO 3 KHASRA 937 INDRA NAGAR DIPAK NAGAR PATEL NAGAR LUCKNOW | ₹17 LSame as L1 | L2 | Rejected-Finance NOT SELECTED BY ONLINE LOTTERY |
| 5 | L2₹17 LSame as L1Rejected-Finance VILL AMSERUWA POST SIDDHOUR DISTT BARABANKI | BARABANKI | ₹17 LSame as L1 | L2 | Rejected-Finance NOT SELECTED BY ONLINE LOTTERY |
Tender Value
₹20 L
EMD Value
₹2 L
Closing Date
16 Jul 2026, 12:00 pmClosed
EE PD PWD BBK
Office of EE PD PWD BBK
Maintenance of Bridges/Culverts in Block-Trivediganj
2026_CEUFZ_1168365_2
3222/10A/2026 DATE-03.07.2026
Open Tender
Civil Works - Bridges
Fixed-rate
365 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2 L
Yes
18 Sept 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment/shoulder with approved material obtained from borrow pits with all lifts and lead of 1km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including cost of all material,Labour,T&P etc. complete as per MORT&H specification and as per direction of Engineer-in-charge. | 3,980 | Cum | 115 | ₹4,57,700 |
| 2 | Construction of embankment/shoulder with approved material obtained from borrow pits with all lifts and lead of 1km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including cost of all material,Labour,T&P etc. complete as per MORT&H specification and as per direction of Engineer-in-charge. | 2,300 | Cum | 220 | ₹5,06,000 |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 115 | Cum | 140 | ₹16,100 |
| 4 | Providing and laying Cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. | 7.5 | Cum | 7,200 | ₹54,000 |
| 5 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 35 | Cum | 950 | ₹33,250 |
| 6 | Brick Masonry Work in Cement Mortar 1:4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. | 50 | Cum | 7,300 | ₹3,65,000 |
| 7 | Providing and laying 350 mm reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. | 30 | rmt | 1,900 | ₹57,000 |
| 8 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give aneven shade, including supply of all materials, labour and T&P etc. rquired for proper completion of the work. As per SOR 660 | 250 | sqm | 68 | ₹17,000 |
| 9 | Empty Bag Filling by sand
Supply and laying of sandy earth plastic cement bags (volume 0.035 cum) including cost of earth, cost of empty bags, labour stiching with sutely complete laying and placing complete at the place of restoration of embankment | 1,700 | Bags | 38 | ₹64,600 |
| 10 | Empty Bag Filling by Earth
Supply and laying of sandy earth plastic cement bags (volume 0.035 cum) including cost of earth, cost of empty bags, labour stiching with sutely complete laying and placing complete at the place of restoration of embankment | 3,380 | Bags | 20 | ₹67,600 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.43 MB
BOQ_2191531.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .