Loading…
Loading…
Tender Value
₹35.0 L
EMD Value
₹3.0 L
Closing Date
8 Jun 2026, 3:00 pm2d left
Executive Engineer
Nagar Nigam Firozabad
Construction work of marriage hall on government land near Panchsheel School in Ward No. 01 Sailai.
2026_DOLBU_1148317_4
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
Municipal Corporation
₹3.0 L
18 May 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 109.99 | Cum | 150 | ₹16,498.5 |
| 2 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). | 22.24 | Cum | 3,234 | ₹71,924.16 |
| 3 | Providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26 Chapter No-06 SI No. 3 Spec. No. 4.1) | 19.11 | Cum | 5,650 | ₹1,07,971.5 |
| 4 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 6.9 | Cum | 8,100 | ₹55,890 |
| 5 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chapter-5, Item No.9 Spec. no. 5.2) | 2.53 | Cum | 8,300 | ₹20,999 |
| 6 | M-15 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (SOR/ PWD 2025-26 Chapter No. 6 SI No. 2) | 60.53 | Cum | 5,500 | ₹3,32,915 |
| 7 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (PWD SOR 2025-26, Chapter-5, Item No.12) | 22.08 | Cum | 8,900 | ₹1,96,512 |
| 8 | Earth filling work with 10km cartage..................... Including all complete. | 448 | Cum | 374 | ₹1,67,552 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).(PWD SOR 2025-26, Chapter-5, Item No.11 Spec. no. 5.2) | 7.23 | Cum | 9,000 | ₹65,070 |
| 10 | M-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work add extra to item No.1 to 4 above for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm( PWD SOR 2025-26, chapter-5, SI No. 2+5) | 100.63 | cum | 5,950 | ₹5,98,748.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
BOQ_2149417.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid