Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC 393 SURYANAGAR COLONEY SILIGURI 734 006 | SILIGURI | DARJEELING | WEST BENGAL | 734006 | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.4 L+₹35,035 (3.89%)Rejected-AOC GANGARAMPUR DAKSHIN DINAJPUR | GANGARAMPUR | DAKSHIN DINAJPUR | WEST BENGAL | 2 | Rejected-AOC L2 | |
| 3 | 3₹9.6 L+₹54,874 (6.09%)Rejected-AOC AURABINDA PALLY RABINDRA SARANI SILIGURI 734006 | SILIGURI | DARJEELING | WEST BENGAL | 734006 | 3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
17 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,KED PWD
O/O the Executive Engineer Upper Cart Road Kalimpong-734301
Temporary lighting arrangement at different DCRC pandels cell compound illumination and Counting Hall in the premises of SUMI School Kalimpong for ensuing WBLA Election2021
2021_WBPWD_330053_1
WBPWD/EE/KED/e-NIQ-02 of 20-21
Open Tender
ELECTRICAL WORKS ORG
Item Rate
15 days
Kalimpong
Please refer Tender documents.
3 documents required · 3 mandatory
₹14,000
Yes
12 Jul 2021
10 Mar 2021
19 Mar 2021
10 Mar 2021
17 Mar 2021
10 Mar 2021
120 days
Amount
S/Providing on hire basis 500V,200A TPNIC switch on wooden plank incl. providing connection and earthing attachment and dismantling the same at the end of programme. a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) Upto 13 days (16th, 17th, 18th April & 2nd May, 2021)
S/Providing on hire basis 415 V, 4 Way, TPN MCB DB on wooden plank board or suitable angle iron frame incl. providing interconnection, socketing, earthing attachment etc. & dismantling the same at the end of the program as per direction of E.I.C. (with PWD approved materials) a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis 250 V, (2+8) Way, SPN MCB DB on wooden plank board or suitable angle iron frame incl. providing interconnection, socketing, earthing attachment etc. & dismantling the same at the end of the program as per direction of E.I.C. (with PWD approved materials) a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis of different K/K Fuse and dismantling the same full fabricated set comprising with 500V-200A- 03nos 500V-63A-TPN-10 nos 500V-32A TPN-22 nos 500V-100A TPN-07 nos a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis 250V,250W Flood HPSV/Metal/LED Flood light fittings complete with bracket clamp etc incl. dismantling the same fixing at different places at School Ground as per direction of EICa) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
c) For the day of counting (2nd May, 2021)
S/Providing,Earthing with 50mm dia G.I. pipe Electrode as per G.S. on hire basis and dismantling same. a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
c) For rest 13 days (19th April to 1st May, 2021)
c) For the day of counting (2nd May, 2021)
S/Drawing on hire basis of suitable 2 x 4-10 sqmm. PVC cable with all other materials as reqd. incl. dismantling the same. a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis Distribution wiring in 2x3/0.036; single core PVC insulated and shethed copper wire to light/Fan points(With individuals control switch considering avg. run 9 mtr.) a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis Distribution wiring in 2x3/0.36 single core PVC insulated and sheathed wire S/F 250V, 5A 5 pin plug socket with switch fixing base and dismantling the same (Anchor). (Avg. Run 10 Mtr)a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis 40W single tube light fitting(box type / commercial type) complete with choke ; starter incl. replacement of fuse tube as and when reqd. do (incl. Counting hall and School Building).a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis call bell incl. dismantling the same.a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
Do- do- do -250V,15A,5 pin plug points -do- a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis 1.1KV Gr. 3.5x95sq.mm PVC/A cable incl. laying in trench incl. dismantling the same. a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis 1.1KV Gr.4x16sq.mm PVC/A cable incl. laying in trench incl. dismantling the same.a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis 1.1KV Gr.4x35sq.mm PVC/A cable incl. laying in trench incl. dismantling the same. a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis pendent light (9/12w) LED fitting incl. 9/12 Watt LED lamp complete with lamp shade etc. incl. dismantling the same.a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis pendent light fitting 23w CFL lamp complete with lamp shade etc. incl. dismantling the same.a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) Upto 4 days (16th, 17th, 18th April & 2nd May, 2021)
S/Providing on hire basis of 11 Mtr long steel pole incl. carrying charges fromCo's work shop to site and making provision for 4 nos metal fittings at the top as per direction of EIC and back to same incl. loading and unloadinga) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
S/Providing on hire basis of 9 mtr long wooden pole incl. carrying charges from Co's work shop to site and back to same incl. loading and unloading.
S/F Bamboo pole on hire for supporting PVC cable and the same a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
S/Providing hire basis 500V,100A TPN C/O switch incl inter connection and dismantling the same.a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
Providing on hire basis 250 Volt, 850/ 925 VA single phase UPS incl. 150 AH, 12 Volt battery complete set incl dismantling the same as per direction of E.I.Ca) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
Hiring & Installation Charges the following DG set---30 KVA DG set- 1 Set.a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
62.5 KVA DG set- 2 seta) Upto 6 days (14th,April to 18th April & 2nd May, 2021) for testing & Commissioning
Carrying charges of all DG sets to the venue from co's workshop and back incl. loading & unloading the same.
Maintenance of temporary installation, repairing of fault, replacement of fuse lamp etc. operation of DG set and its mtc. by engaging licenced Electrician/ Supervisors and helper through out the programme as per EIC.
S/Filling of H.S Diesel for DG set.
S/Providing on hire basis of Spike buster having at least 5 x 5 pin 6Amp socket with control switch ; fuse indicator etc a) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
S/Providing on hire basis of 600mm AC Pedestral / Air circulator fana) Upto 6 days (14th,April to 18th April & 2nd May, 2021)
b) For rest 13 days (19th April to 1st May, 2021)
SEN ENTERPRISE
NIHAR RANJAN SAHA
stage.html
html • 0.05 MB
technical_628308.pdf
PDF • 0.20 MB
techsummary_628308.pdf
PDF • 0.21 MB
finance_628308.pdf
PDF • 0.22 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_628308.pdf
PDF • 0.24 MB
330053.pdf
PDF • 3.71 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .