| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.4 LAccepted-AOC | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹6.4 L+₹1.1 L (20.1%)Rejected-AOC | L-2 | Rejected-AOC reject | |
| 3 | L-3₹6.5 L+₹1.1 L (20.8%)Rejected-AOC | L-3 | Rejected-AOC reject | |
| 4 | L-4₹6.5 L+₹1.1 L (21.1%)Rejected-AOC 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | L-4 | Rejected-AOC reject |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
10 Apr 2023, 1:00 pmClosed
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
Line construction work for giving 15 KW connection to new railway station Achhnera Agra against the sanctioned package in full deposit scheme under the area of EDD- IV Kirawali
2023_DVVNL_791174_1
102/EDCA/2022-23
Open Tender
Electrical Works
Piece-work
60 days
B-690 Kamla Nagar Agra
As Per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹7,000
23 May 2023
29 Mar 2023
10 Apr 2023
29 Mar 2023
10 Apr 2023
29 Mar 2023
Carriage of following material from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. (Distance 00-70 Kms.)
PCC Pole 8.5 Mtr Long.
25 KVA T/F
11 KV 3×70 sqmm XLPE Cable
Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material & All required Material as per Package/Estimate.
Erection and grouting of single pole on 8.5 Mtr. long PCC poles including fixing of all accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of double pole on 8.5 Mtr. long PCC poles including fixing of all accessories for double pole S/s as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of stays as per norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Guarding of LT/HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
Making HT 'T' off connection on existing mains labour, T &P and carrier etc as per RESPO Norms as required for proper completion of work.
providing of 6" dia G.I. pipe for Laying of 11KV 3x70 sqmm XLPE Cable.
Fixing of G.I. Pipe 6" Dia on Double Pole with Clamps and other accesseories for Hoisting of 11KV 3x70 sqmm XLPE Cables and all associated works to complete the job satisfactory as per RESPO norms.
Laying of 11 KV 3x70 sqmm XLPE cable in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms.
Cable Laying under railway crossing by H.D.D. Machine/Trenchless method for Laying of 11 KV 3x70 sqmm XLPE cable double circuit ,Through G.I. pipe including the cost of arrangment of labour, T&P & H.D.D. machine as per site requirment.
Laying and dressing of 11 KV under ground cable of size 3x70 sq mm XLPE cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.
Providing & Filling of 11KV outdoor cable Jointing Kit (3×70 sqmm) and making connection as per RESPO norms.
Installation of 25 KVA T/F on newly erected double pole & making HT/LT connection.
Laying sagging stringing and binding and jumpering of ACSR Weasel Conductor at 11 KV line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Intallation & Fixing of 11 KV TPMO as per RESPO Norms.
Providing & Fixing of Danger Board with Clamp on Poles as per RESPO norms.
Providing & Fixing of Number Plate on Poles as per RESPO norms.
Gowri Associates
aashirvad contractor
ABHISHEK ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .